An expert system to optimize cost and schedule of heavy earthmoving operations for earth- and rock- filled dam projects
Success of major embankment dam construction projects is measured by the enormity of optimizing costs and schedules of selected heavy equipment based on their operational analyses. In this paper, the main objective is geared towards developing a knowledge-based decision support system for optimizin...
Main Authors: | Nizar Markiz, Ahmad Jrade |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2017-02-01
|
Series: | Journal of Civil Engineering and Management |
Subjects: | |
Online Access: | http://journals.vgtu.lt/index.php/JCEM/article/view/957 |
Similar Items
-
An Expert System Integrated with a Bridge Information Management System (BrIMS), Cost Estimating, Deterioration Forecasting, and Linear Scheduling at the Conceptual Design Stage
by: Markiz, Nizar
Published: (2018) -
The mechanics of ejector unloading systems in earthmoving equipment
by: Al-Janabi, Z. K. K.
Published: (1990) -
Productivity analysis of earthmoving operations
by: Gomez Rueda, Oscar J
Published: (2011) -
The life expectancy of heavy earthmoving equipment on a sand dune mine in a highly corrosive environment
by: Klopper, Marthinus Ferreira
Published: (2013) -
On Scheduling Policies With Heavy-Tailed Dynamics in Wireless Queueing Systems
by: Shengbo Chen, et al.
Published: (2020-01-01)