Erratum to “A Case Study on Stratified Settlement and Rebound Characteristics due to Dewatering in Shanghai Subway Station”
Main Authors: | Jianxiu Wang, Tianrong Huang, Dongchang Sui |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2013-01-01
|
Series: | The Scientific World Journal |
Online Access: | http://dx.doi.org/10.1155/2013/839826 |
Similar Items
-
A Case Study on Stratified Settlement and Rebound Characteristics due to Dewatering in Shanghai Subway Station
by: Jianxiu Wang, et al.
Published: (2013-01-01) -
Study on characteristics of suspended particulate in subway station
by: Ying-Yi Chen, et al.
Published: (2017) -
Study on Settlement and Deformation of Urban Viaduct Caused by Subway Station Construction under Complicated Conditions
by: Cong-shuang Luo, et al.
Published: (2021-01-01) -
Prevention partition for land subsidence induced by engineering dewatering in Shanghai
by: J. X. Wang, et al.
Published: (2015-11-01) -
Settlement characteristics of major infrastructures in Shanghai
by: X. Jiao, et al.
Published: (2015-11-01)