Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak
Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 3 phase with cy...
Main Author: | |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Department of Electrical Engineering, Faculty of Engineering, Tanjungpura University
2017-10-01
|
Series: | Elkha: Jurnal Teknik Elektro |
Online Access: | http://jurnal.untan.ac.id/index.php/Elkha/article/view/22731 |
id |
doaj-bce48f5f98d84f9d826b970cb561d8e7 |
---|---|
record_format |
Article |
spelling |
doaj-bce48f5f98d84f9d826b970cb561d8e72020-11-25T01:22:01ZindDepartment of Electrical Engineering, Faculty of Engineering, Tanjungpura UniversityElkha: Jurnal Teknik Elektro1858-14632580-68072017-10-019281310.26418/elkha.v9i2.2273118180Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota PontianakHeri AzwansyahAbstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 3 phase with cycle time 160 second. Green time of actual for phase 1 (Street of Jl. Imam Bonjol (a)) equal to 66 second, for phase 2 (Street of Jl. Imam Bonjol (b)) equal to 63 second, and for phase 3 (Street of Abdul Rahman Saleh) equal to 10 second. Keywords- Traffic Light, Cycle Time, Green Timehttp://jurnal.untan.ac.id/index.php/Elkha/article/view/22731 |
collection |
DOAJ |
language |
Indonesian |
format |
Article |
sources |
DOAJ |
author |
Heri Azwansyah |
spellingShingle |
Heri Azwansyah Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak Elkha: Jurnal Teknik Elektro |
author_facet |
Heri Azwansyah |
author_sort |
Heri Azwansyah |
title |
Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak |
title_short |
Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak |
title_full |
Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak |
title_fullStr |
Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak |
title_full_unstemmed |
Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak |
title_sort |
perencanaan sinyal lalu lintas persimpangan tiga lengan pada jl. imam bonjol – jl. abdul rahman saleh kota pontianak |
publisher |
Department of Electrical Engineering, Faculty of Engineering, Tanjungpura University |
series |
Elkha: Jurnal Teknik Elektro |
issn |
1858-1463 2580-6807 |
publishDate |
2017-10-01 |
description |
Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City.
This Study require data of intersection geometric and vehicle traffic obtained of field survey.
This study yield planning of traffic light 3 phase with cycle time 160 second. Green time of actual for phase 1 (Street of Jl. Imam Bonjol (a)) equal to 66 second, for phase 2 (Street of Jl. Imam Bonjol (b)) equal to 63 second, and for phase 3 (Street of Abdul Rahman Saleh) equal to 10 second.
Keywords- Traffic Light, Cycle Time, Green Time |
url |
http://jurnal.untan.ac.id/index.php/Elkha/article/view/22731 |
work_keys_str_mv |
AT heriazwansyah perencanaansinyallalulintaspersimpangantigalenganpadajlimambonjoljlabdulrahmansalehkotapontianak |
_version_ |
1725128269046480896 |