Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak
Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 3 phase with cy...
Main Author: | |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Department of Electrical Engineering, Faculty of Engineering, Tanjungpura University
2017-10-01
|
Series: | Elkha: Jurnal Teknik Elektro |
Online Access: | http://jurnal.untan.ac.id/index.php/Elkha/article/view/22731 |
Summary: | Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City.
This Study require data of intersection geometric and vehicle traffic obtained of field survey.
This study yield planning of traffic light 3 phase with cycle time 160 second. Green time of actual for phase 1 (Street of Jl. Imam Bonjol (a)) equal to 66 second, for phase 2 (Street of Jl. Imam Bonjol (b)) equal to 63 second, and for phase 3 (Street of Abdul Rahman Saleh) equal to 10 second.
Keywords- Traffic Light, Cycle Time, Green Time |
---|---|
ISSN: | 1858-1463 2580-6807 |