Reliability Design of Soft Soil Foundation Preloading Method for Airport Runway

Focusing on the rapid assessment of the reliability of airport runway soft soil foundation, taking the soft soil foundation preloading method as the research object, we established the corresponding settlement calculation model and studied the soil parameters and how they affect the settlement value...

Full description

Bibliographic Details
Main Authors: Qingkun Yu, Liangcai Cai, Xiang Shi
Format: Article
Language:English
Published: Hindawi Limited 2019-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2019/5204372
id doaj-b959d2002bc74105904d05b7b9e4405f
record_format Article
spelling doaj-b959d2002bc74105904d05b7b9e4405f2020-11-25T02:37:03ZengHindawi LimitedAdvances in Civil Engineering1687-80861687-80942019-01-01201910.1155/2019/52043725204372Reliability Design of Soft Soil Foundation Preloading Method for Airport RunwayQingkun Yu0Liangcai Cai1Xiang Shi2Air Force Engineering University, Xi’an, Shaanxi 710038, ChinaAir Force Engineering University, Xi’an, Shaanxi 710038, ChinaAir Force Second Logistics Training Base, Tai’an, Shandong 271000, ChinaFocusing on the rapid assessment of the reliability of airport runway soft soil foundation, taking the soft soil foundation preloading method as the research object, we established the corresponding settlement calculation model and studied the soil parameters and how they affect the settlement values, and the reliability of the soft soil foundation preloading method was obtained by the checking point method (JC). In order to realize the fast calculation of reliability, Visual Studio 2010 is used to design the visual reliability calculation program of the airport runway soft soil foundation preloading method. The analysis results showed that the soil index with the greatest influence on the final consolidation settlement was the compression coefficient, followed by the soil layer thickness, the compression modulus, the void ratio, and the consolidation coefficient. On the basis of the limit state equation, we got the final failure probability formula. Combined with an airport project example, the reliability calculation results showed that the longer the preloading time was, the more reliable the treatment plan was, and the less the probability of failure was; the larger the preloading pressure was, the more reliable the treatment plan was, and the less the probability of failure was. In the engineering example, it can be found that the treatment plan with the preloading of 100 kPa and the stacking time of 150 days is the best solution.http://dx.doi.org/10.1155/2019/5204372
collection DOAJ
language English
format Article
sources DOAJ
author Qingkun Yu
Liangcai Cai
Xiang Shi
spellingShingle Qingkun Yu
Liangcai Cai
Xiang Shi
Reliability Design of Soft Soil Foundation Preloading Method for Airport Runway
Advances in Civil Engineering
author_facet Qingkun Yu
Liangcai Cai
Xiang Shi
author_sort Qingkun Yu
title Reliability Design of Soft Soil Foundation Preloading Method for Airport Runway
title_short Reliability Design of Soft Soil Foundation Preloading Method for Airport Runway
title_full Reliability Design of Soft Soil Foundation Preloading Method for Airport Runway
title_fullStr Reliability Design of Soft Soil Foundation Preloading Method for Airport Runway
title_full_unstemmed Reliability Design of Soft Soil Foundation Preloading Method for Airport Runway
title_sort reliability design of soft soil foundation preloading method for airport runway
publisher Hindawi Limited
series Advances in Civil Engineering
issn 1687-8086
1687-8094
publishDate 2019-01-01
description Focusing on the rapid assessment of the reliability of airport runway soft soil foundation, taking the soft soil foundation preloading method as the research object, we established the corresponding settlement calculation model and studied the soil parameters and how they affect the settlement values, and the reliability of the soft soil foundation preloading method was obtained by the checking point method (JC). In order to realize the fast calculation of reliability, Visual Studio 2010 is used to design the visual reliability calculation program of the airport runway soft soil foundation preloading method. The analysis results showed that the soil index with the greatest influence on the final consolidation settlement was the compression coefficient, followed by the soil layer thickness, the compression modulus, the void ratio, and the consolidation coefficient. On the basis of the limit state equation, we got the final failure probability formula. Combined with an airport project example, the reliability calculation results showed that the longer the preloading time was, the more reliable the treatment plan was, and the less the probability of failure was; the larger the preloading pressure was, the more reliable the treatment plan was, and the less the probability of failure was. In the engineering example, it can be found that the treatment plan with the preloading of 100 kPa and the stacking time of 150 days is the best solution.
url http://dx.doi.org/10.1155/2019/5204372
work_keys_str_mv AT qingkunyu reliabilitydesignofsoftsoilfoundationpreloadingmethodforairportrunway
AT liangcaicai reliabilitydesignofsoftsoilfoundationpreloadingmethodforairportrunway
AT xiangshi reliabilitydesignofsoftsoilfoundationpreloadingmethodforairportrunway
_version_ 1724797028587798528