Developing and Solving a New Bi-Objective Model to Assign Human Resource And Equipment to Parallel Workstations in a Product ion Line Using Optimization Via Simulation Technique
In this study, the use of simulation technique in bi-objective optimization of assembly line balancing problem has been studied. The aim of this paper is to determine optimal allocation of human resource and equipment to parallel workstations in order to minimize the cost of adding equipment and man...
Main Authors: | Parham Azimi, Mohammad saeed Company |
---|---|
Format: | Article |
Language: | fas |
Published: |
Allameh Tabataba'i University Press
2017-10-01
|
Series: | Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī |
Subjects: | |
Online Access: | http://jims.atu.ac.ir/article_7988_90c3f71bd16b80e3daf0bf0b8c828f5a.pdf |
Similar Items
-
Integrated model for line balancing with workstation inventory management
by: Dilip Roy, et al.
Published: (2010-06-01) -
Multi-objective optimization algorithms for mixed model assembly line balancing problem with parallel workstations
by: Masoud Rabbani, et al.
Published: (2016-12-01) -
A Hybrid Genetic Algorithm for the Simple Assembly Line Balancing Problem with a Fixed Number of Workstations
by: Eduardo Álvarez-Miranda, et al.
Published: (2021-09-01) -
Using metaheuristic algorithms for solving a mixed model assembly line balancing problem considering express parallel line and learning effect
by: Masoud Rabbani, et al.
Published: (2018-06-01) -
A Heuristic-Mixed Genetic Algorithm for Type II Assembly Line Balancing with Multiple Workers in Workstations
by: Qian, X.
Published: (2022)