Continuous action right knife unit with ground interaction analysis

Introduction. To solve the problem of accelerating the construction of roads, improving their quality, it is advisable to use a continuous action unit to form a underlying layer. The main working bodies of this unit are buckets, which cut off the soil layer from below and on the side. At the same ti...

Full description

Bibliographic Details
Main Authors: V. A. Nikolayev, D. I. Troshin
Format: Article
Language:Russian
Published: Siberian State Automobile and Highway University 2020-08-01
Series:Вестник СибАДИ
Subjects:
Online Access:https://vestnik.sibadi.org/jour/article/view/1116