Maddalena exploratory adit: feedback on hydrogeological and geothermal aspects
The 7.5 km long and 6,3 m diameter La Maddalena pilot tunnel is part of the international project of the new high speed rail link between Turin and Lyon, on the Italian side of the project (Chiomonte, TO). Among the geological surveys that are systematically performed during the excavation of the pi...
Main Authors: | Antonio Dematteis, Piergiuseppe Gilli, Maria Elena Parisi, Lorenzo Ferrero, Fabio Furno |
---|---|
Format: | Article |
Language: | English |
Published: |
PAGEPress Publications
2016-10-01
|
Series: | Acque Sotterranee |
Subjects: | |
Online Access: | http://www.acquesotterranee.online/index.php/acque/article/view/201 |
Similar Items
-
Aditions to the Flora of Colombia Aditions to the Flora of Colombia
by: Hermann J. F.
Published: (1948-06-01) -
The Assertion of French Opposition to the “Lyon-Turin” Rail Link: a Conflict Between Liminality and Intermediate Spatiality
by: Kevin Sutton
Published: (2016-05-01) -
L’affirmation d’une opposition française au « Lyon-Turin » : un conflit entre liminarité et intermédiarité
by: Kevin Sutton
Published: (2016-04-01) -
Drainage Adits in Upper Silesia – Industrial Technology Heritage and Important Elements of the Hydrotechnical Infrastructure
by: Duży Stanisław, et al.
Published: (2017-12-01) -
Comportement des tunnels en terrain poussant
by: Tran Manh, Huy
Published: (2014)