A COST OPTIMISED PROCESS MEAN SET POINT FOR TWO SIDED SPECIFICATIONS
<p>ENGLISH ABSTRACT: This paper describesthe derivationof cost minimisingexpressions to optimallyset the processmeanof a manufacturing processrestrictedby a double-sidedspecification. Two scenariosare considered. For the first scenario,multiplereworkingiterationsare possible,while in t...
Main Authors: | W. Van Wijck, M. Von Benecke |
---|---|
Format: | Article |
Language: | English |
Published: |
Stellenbosch University
2012-01-01
|
Series: | South African Journal of Industrial Engineering |
Online Access: | http://sajie.journals.ac.za/pub/article/view/375 |
Similar Items
-
TWO-SIDED FOCUSING OF ELECTROMAGNETIC FIELD OF POINT SOURCE BY MEANS OF PLANAR LENS FROM METAMATERIALS
by: V. T. Erofeenko
Published: (2016-10-01) -
One-Sided and Two One-Sided Multivariate Homogeneously Weighted Moving Charts for Monitoring Process Mean
by: Nurudeen A. Adegoke, et al.
Published: (2021-01-01) -
Cost-benefit analysis for setting the recreation activities on hill side
by: LIN, SHI-JIAN, et al.
Published: (1993) -
Fixed Points of Two-Sided Fractional Matrix Transformations
by: David Handelman
Published: (2007-02-01) -
Fixed Points of Two-Sided Fractional Matrix Transformations
by: Handelman David
Published: (2007-01-01)