DESIGN OF INCENTIVE WAGES WITH STANDARD TIME TO IMPROVE PACKAGE OPERATOR PERFORMANCE (A Case Study at PT. XYZ)
XYZ is a company engaged in the paper industry, which is located in West Java. Since established in 1976, this company has produced photocopy paper in the form of reams. This company has advantages in terms of paper quality so that its products dominate the international market and the domestic mark...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Industrial Engineering Department Faculty of Industrial Technology Universitas Ahmad Dahlan
2021-04-01
|
Series: | Spektrum Industri: Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri |
Subjects: | |
Online Access: | http://journal.uad.ac.id/index.php/Spektrum/article/view/19272 |
id |
doaj-b486bf07e12a4f4d91daeccd5a47031b |
---|---|
record_format |
Article |
spelling |
doaj-b486bf07e12a4f4d91daeccd5a47031b2021-06-08T06:08:35ZengIndustrial Engineering Department Faculty of Industrial Technology Universitas Ahmad DahlanSpektrum Industri: Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri1693-65902442-26302021-04-0119111410.12928/si.v19i1.19272DESIGN OF INCENTIVE WAGES WITH STANDARD TIME TO IMPROVE PACKAGE OPERATOR PERFORMANCE (A Case Study at PT. XYZ)Nana Rahdiana0Sani Suhardiman1Khoirudin2Industrial Engineering Department, University of Buana Perjuangan KarawangIndustrial Engineering Department, University of Buana Perjuangan KarawangMechanical Engineering Department, University of Buana Perjuangan KarawangXYZ is a company engaged in the paper industry, which is located in West Java. Since established in 1976, this company has produced photocopy paper in the form of reams. This company has advantages in terms of paper quality so that its products dominate the international market and the domestic market. With a very tight level of market competition, companies must continue to work optimally to continuously improve employee performance and company productivity. The purpose of this study is to plan an incentive-based employee wage system, which is suitable and in accordance with company conditions. Incentive wages are important as one of the main components to increase and maintain motivation, performance and work integrity. This research was conducted in the Finishing Department of the copy manual wrapping work unit. The method used are the Piecework method, the Halsey method, and the Rowan method. The result of this research is a comparison of the amount of wages between the wage system used by the company and the three methods of incentive pay as a company alternative. From the comparison of the three incentive wage design methods, the authors recommend the Halsey method as the best method that is able to provide benefits for both the company and for workers which we call dual mutualism. The Halsey method still guarantees a basic wage and a decent incentive wage for workers as a motivation to work faster and better.http://journal.uad.ac.id/index.php/Spektrum/article/view/19272incentive wagepiecework halseyrowan |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Nana Rahdiana Sani Suhardiman Khoirudin |
spellingShingle |
Nana Rahdiana Sani Suhardiman Khoirudin DESIGN OF INCENTIVE WAGES WITH STANDARD TIME TO IMPROVE PACKAGE OPERATOR PERFORMANCE (A Case Study at PT. XYZ) Spektrum Industri: Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri incentive wage piecework halsey rowan |
author_facet |
Nana Rahdiana Sani Suhardiman Khoirudin |
author_sort |
Nana Rahdiana |
title |
DESIGN OF INCENTIVE WAGES WITH STANDARD TIME TO IMPROVE PACKAGE OPERATOR PERFORMANCE (A Case Study at PT. XYZ) |
title_short |
DESIGN OF INCENTIVE WAGES WITH STANDARD TIME TO IMPROVE PACKAGE OPERATOR PERFORMANCE (A Case Study at PT. XYZ) |
title_full |
DESIGN OF INCENTIVE WAGES WITH STANDARD TIME TO IMPROVE PACKAGE OPERATOR PERFORMANCE (A Case Study at PT. XYZ) |
title_fullStr |
DESIGN OF INCENTIVE WAGES WITH STANDARD TIME TO IMPROVE PACKAGE OPERATOR PERFORMANCE (A Case Study at PT. XYZ) |
title_full_unstemmed |
DESIGN OF INCENTIVE WAGES WITH STANDARD TIME TO IMPROVE PACKAGE OPERATOR PERFORMANCE (A Case Study at PT. XYZ) |
title_sort |
design of incentive wages with standard time to improve package operator performance (a case study at pt. xyz) |
publisher |
Industrial Engineering Department Faculty of Industrial Technology Universitas Ahmad Dahlan |
series |
Spektrum Industri: Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri |
issn |
1693-6590 2442-2630 |
publishDate |
2021-04-01 |
description |
XYZ is a company engaged in the paper industry, which is located in West Java. Since established in 1976, this company has produced photocopy paper in the form of reams. This company has advantages in terms of paper quality so that its products dominate the international market and the domestic market. With a very tight level of market competition, companies must continue to work optimally to continuously improve employee performance and company productivity. The purpose of this study is to plan an incentive-based employee wage system, which is suitable and in accordance with company conditions. Incentive wages are important as one of the main components to increase and maintain motivation, performance and work integrity. This research was conducted in the Finishing Department of the copy manual wrapping work unit. The method used are the Piecework method, the Halsey method, and the Rowan method. The result of this research is a comparison of the amount of wages between the wage system used by the company and the three methods of incentive pay as a company alternative. From the comparison of the three incentive wage design methods, the authors recommend the Halsey method as the best method that is able to provide benefits for both the company and for workers which we call dual mutualism. The Halsey method still guarantees a basic wage and a decent incentive wage for workers as a motivation to work faster and better. |
topic |
incentive wage piecework halsey rowan |
url |
http://journal.uad.ac.id/index.php/Spektrum/article/view/19272 |
work_keys_str_mv |
AT nanarahdiana designofincentivewageswithstandardtimetoimprovepackageoperatorperformanceacasestudyatptxyz AT sanisuhardiman designofincentivewageswithstandardtimetoimprovepackageoperatorperformanceacasestudyatptxyz AT khoirudin designofincentivewageswithstandardtimetoimprovepackageoperatorperformanceacasestudyatptxyz |
_version_ |
1721389969282433024 |