Backup Alternatives for 110 kV Lines
The paper describes backup alternatives for 110 kV lines. Line backup is one of input parameters used to optimise the renovation of 110 kV lines. The optimisation is based on the principle of reliability centred maintenance (RCM) which depends on the technical condition and importance of a particula...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
VSB-Technical University of Ostrava
2013-01-01
|
Series: | Advances in Electrical and Electronic Engineering |
Subjects: | |
Online Access: | http://advances.utc.sk/index.php/AEEE/article/view/796 |