Estimating the Efforts of Mobile Application Development in the Planning Phase Using Nonlinear Regression Analysis
The authors consider the construction of a nonlinear multiple regression model, its confidence and prediction intervals to evaluate the efforts of mobile application development in the planning phase based on the multivariate normalizing transformation and outlier detection. The constructed model is...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2020-12-01
|
Series: | Applied Computer Systems |
Subjects: | |
Online Access: | https://doi.org/10.2478/acss-2020-0019 |
id |
doaj-b2bd9c62a4164acb8356bdec7044167e |
---|---|
record_format |
Article |
spelling |
doaj-b2bd9c62a4164acb8356bdec7044167e2021-09-06T19:41:01ZengSciendoApplied Computer Systems2255-86912020-12-0125217217910.2478/acss-2020-0019acss-2020-0019Estimating the Efforts of Mobile Application Development in the Planning Phase Using Nonlinear Regression AnalysisPrykhodko Sergiy0Prykhodko Natalia1Knyrik Kateryna2Admiral Makarov National University of Shipbuilding, Mykolaiv, UkraineAdmiral Makarov National University of Shipbuilding, Mykolaiv, UkraineAdmiral Makarov National University of Shipbuilding, Mykolaiv, UkraineThe authors consider the construction of a nonlinear multiple regression model, its confidence and prediction intervals to evaluate the efforts of mobile application development in the planning phase based on the multivariate normalizing transformation and outlier detection. The constructed model is compared to the linear regression model and nonlinear regression models based on the univariate transformations, such as the decimal logarithm, Box–Cox, and Johnson transformation. This model, in comparison with other regression models, has better prediction accuracy.https://doi.org/10.2478/acss-2020-0019estimationmaximum likelihood estimationmobile applicationsparameter estimationplanningregression analysistransform |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Prykhodko Sergiy Prykhodko Natalia Knyrik Kateryna |
spellingShingle |
Prykhodko Sergiy Prykhodko Natalia Knyrik Kateryna Estimating the Efforts of Mobile Application Development in the Planning Phase Using Nonlinear Regression Analysis Applied Computer Systems estimation maximum likelihood estimation mobile applications parameter estimation planning regression analysis transform |
author_facet |
Prykhodko Sergiy Prykhodko Natalia Knyrik Kateryna |
author_sort |
Prykhodko Sergiy |
title |
Estimating the Efforts of Mobile Application Development in the Planning Phase Using Nonlinear Regression Analysis |
title_short |
Estimating the Efforts of Mobile Application Development in the Planning Phase Using Nonlinear Regression Analysis |
title_full |
Estimating the Efforts of Mobile Application Development in the Planning Phase Using Nonlinear Regression Analysis |
title_fullStr |
Estimating the Efforts of Mobile Application Development in the Planning Phase Using Nonlinear Regression Analysis |
title_full_unstemmed |
Estimating the Efforts of Mobile Application Development in the Planning Phase Using Nonlinear Regression Analysis |
title_sort |
estimating the efforts of mobile application development in the planning phase using nonlinear regression analysis |
publisher |
Sciendo |
series |
Applied Computer Systems |
issn |
2255-8691 |
publishDate |
2020-12-01 |
description |
The authors consider the construction of a nonlinear multiple regression model, its confidence and prediction intervals to evaluate the efforts of mobile application development in the planning phase based on the multivariate normalizing transformation and outlier detection. The constructed model is compared to the linear regression model and nonlinear regression models based on the univariate transformations, such as the decimal logarithm, Box–Cox, and Johnson transformation. This model, in comparison with other regression models, has better prediction accuracy. |
topic |
estimation maximum likelihood estimation mobile applications parameter estimation planning regression analysis transform |
url |
https://doi.org/10.2478/acss-2020-0019 |
work_keys_str_mv |
AT prykhodkosergiy estimatingtheeffortsofmobileapplicationdevelopmentintheplanningphaseusingnonlinearregressionanalysis AT prykhodkonatalia estimatingtheeffortsofmobileapplicationdevelopmentintheplanningphaseusingnonlinearregressionanalysis AT knyrikkateryna estimatingtheeffortsofmobileapplicationdevelopmentintheplanningphaseusingnonlinearregressionanalysis |
_version_ |
1717767244857999360 |