DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS
The dynamic technology innovations and the constant changes in the world geopolitical scenarios have been creating turbulences in the majority of the environments in which the petroleum industry organizations are situated. Therefore, it is vital for the development and survival of these organization...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universidade Nove de Julho
2011-05-01
|
Series: | Revista de Gestão e Projetos |
Online Access: | http://revistagep.org/ojs/index.php/gep/article/view/14 |
id |
doaj-b2a4a44fd52148b5ba2bda89ef55ad22 |
---|---|
record_format |
Article |
spelling |
doaj-b2a4a44fd52148b5ba2bda89ef55ad222020-11-25T01:25:45ZengUniversidade Nove de JulhoRevista de Gestão e Projetos 2236-09722011-05-0112264810.5585/gep.v1i2.1412DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRASAntonio Carlos de Lemos Oliveira0Leonardo Rabello da Silva1Luciana Mourao TemporalGlaiton SerafimOscar Pedro Amaral MartinsProfessor do Departamento de Engenharia Industrial da Universidade do Estado do Rio de Janeiro – UERJProfessor convidado nas Universidades Gama Filho e Católica de PetrópolisThe dynamic technology innovations and the constant changes in the world geopolitical scenarios have been creating turbulences in the majority of the environments in which the petroleum industry organizations are situated. Therefore, it is vital for the development and survival of these organizations that they establish a management and planning process capable of offering flexible answers to all challenges that arise in this business. Inside this context, this paper intends to investigate the ongoing techniques used for the deployment of goals and performance management of the employees who work for the engineering department of Petrobras, comparing the behavior of four organization structures named UIE - Unidade de Implementação de Empreendimento, considering some of their scores and the results of the existing individual management body of each of these structures. The main research instruments used in this case study were the documental analyses and semi-structured interviews with the main authors of the formulation and implementation process for the planning and management of the company, beyond the direct observation of these process. The paper accomplishes its goals and brings results and proposals that perceive a continuous development of the Performance Management system in the engineering department of Petrobras.http://revistagep.org/ojs/index.php/gep/article/view/14 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Antonio Carlos de Lemos Oliveira Leonardo Rabello da Silva Luciana Mourao Temporal Glaiton Serafim Oscar Pedro Amaral Martins |
spellingShingle |
Antonio Carlos de Lemos Oliveira Leonardo Rabello da Silva Luciana Mourao Temporal Glaiton Serafim Oscar Pedro Amaral Martins DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS Revista de Gestão e Projetos |
author_facet |
Antonio Carlos de Lemos Oliveira Leonardo Rabello da Silva Luciana Mourao Temporal Glaiton Serafim Oscar Pedro Amaral Martins |
author_sort |
Antonio Carlos de Lemos Oliveira |
title |
DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS |
title_short |
DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS |
title_full |
DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS |
title_fullStr |
DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS |
title_full_unstemmed |
DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS |
title_sort |
deployment of goals and project performance management case study in the engineering department of petrobras |
publisher |
Universidade Nove de Julho |
series |
Revista de Gestão e Projetos |
issn |
2236-0972 |
publishDate |
2011-05-01 |
description |
The dynamic technology innovations and the constant changes in the world geopolitical scenarios have been creating turbulences in the majority of the environments in which the petroleum industry organizations are situated. Therefore, it is vital for the development and survival of these organizations that they establish a management and planning process capable of offering flexible answers to all challenges that arise in this business. Inside this context, this paper intends to investigate the ongoing techniques used for the deployment of goals and performance management of the employees who work for the engineering department of Petrobras, comparing the behavior of four organization structures named UIE - Unidade de Implementação de Empreendimento, considering some of their scores and the results of the existing individual management body of each of these structures. The main research instruments used in this case study were the documental analyses and semi-structured interviews with the main authors of the formulation and implementation process for the planning and management of the company, beyond the direct observation of these process. The paper accomplishes its goals and brings results and proposals that perceive a continuous development of the Performance Management system in the engineering department of Petrobras. |
url |
http://revistagep.org/ojs/index.php/gep/article/view/14 |
work_keys_str_mv |
AT antoniocarlosdelemosoliveira deploymentofgoalsandprojectperformancemanagementcasestudyintheengineeringdepartmentofpetrobras AT leonardorabellodasilva deploymentofgoalsandprojectperformancemanagementcasestudyintheengineeringdepartmentofpetrobras AT lucianamouraotemporal deploymentofgoalsandprojectperformancemanagementcasestudyintheengineeringdepartmentofpetrobras AT glaitonserafim deploymentofgoalsandprojectperformancemanagementcasestudyintheengineeringdepartmentofpetrobras AT oscarpedroamaralmartins deploymentofgoalsandprojectperformancemanagementcasestudyintheengineeringdepartmentofpetrobras |
_version_ |
1725112065978269696 |