DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS

The dynamic technology innovations and the constant changes in the world geopolitical scenarios have been creating turbulences in the majority of the environments in which the petroleum industry organizations are situated. Therefore, it is vital for the development and survival of these organization...

Full description

Bibliographic Details
Main Authors: Antonio Carlos de Lemos Oliveira, Leonardo Rabello da Silva, Luciana Mourao Temporal, Glaiton Serafim, Oscar Pedro Amaral Martins
Format: Article
Language:English
Published: Universidade Nove de Julho 2011-05-01
Series:Revista de Gestão e Projetos
Online Access:http://revistagep.org/ojs/index.php/gep/article/view/14
id doaj-b2a4a44fd52148b5ba2bda89ef55ad22
record_format Article
spelling doaj-b2a4a44fd52148b5ba2bda89ef55ad222020-11-25T01:25:45ZengUniversidade Nove de JulhoRevista de Gestão e Projetos 2236-09722011-05-0112264810.5585/gep.v1i2.1412DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRASAntonio Carlos de Lemos Oliveira0Leonardo Rabello da Silva1Luciana Mourao TemporalGlaiton SerafimOscar Pedro Amaral MartinsProfessor do Departamento de Engenharia Industrial da Universidade do Estado do Rio de Janeiro – UERJProfessor convidado nas Universidades Gama Filho e Católica de PetrópolisThe dynamic technology innovations and the constant changes in the world geopolitical scenarios have been creating turbulences in the majority of the environments in which the petroleum industry organizations are situated. Therefore, it is vital for the development and survival of these organizations that they establish a management and planning process capable of offering flexible answers to all challenges that arise in this business. Inside this context, this paper intends to investigate the ongoing techniques used for the deployment of goals and performance management of the employees who work for the engineering department of Petrobras, comparing the behavior of four organization structures named UIE - Unidade de Implementação de Empreendimento, considering some of their scores and the results of the existing individual management body of each of these structures. The main research instruments used in this case study were the documental analyses and semi-structured interviews with the main authors of the formulation and implementation process for the planning and management of the company, beyond the direct observation of these process. The paper accomplishes its goals and brings results and proposals that perceive a continuous development of the Performance Management system in the engineering department of Petrobras.http://revistagep.org/ojs/index.php/gep/article/view/14
collection DOAJ
language English
format Article
sources DOAJ
author Antonio Carlos de Lemos Oliveira
Leonardo Rabello da Silva
Luciana Mourao Temporal
Glaiton Serafim
Oscar Pedro Amaral Martins
spellingShingle Antonio Carlos de Lemos Oliveira
Leonardo Rabello da Silva
Luciana Mourao Temporal
Glaiton Serafim
Oscar Pedro Amaral Martins
DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS
Revista de Gestão e Projetos
author_facet Antonio Carlos de Lemos Oliveira
Leonardo Rabello da Silva
Luciana Mourao Temporal
Glaiton Serafim
Oscar Pedro Amaral Martins
author_sort Antonio Carlos de Lemos Oliveira
title DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS
title_short DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS
title_full DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS
title_fullStr DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS
title_full_unstemmed DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS
title_sort deployment of goals and project performance management case study in the engineering department of petrobras
publisher Universidade Nove de Julho
series Revista de Gestão e Projetos
issn 2236-0972
publishDate 2011-05-01
description The dynamic technology innovations and the constant changes in the world geopolitical scenarios have been creating turbulences in the majority of the environments in which the petroleum industry organizations are situated. Therefore, it is vital for the development and survival of these organizations that they establish a management and planning process capable of offering flexible answers to all challenges that arise in this business. Inside this context, this paper intends to investigate the ongoing techniques used for the deployment of goals and performance management of the employees who work for the engineering department of Petrobras, comparing the behavior of four organization structures named UIE - Unidade de Implementação de Empreendimento, considering some of their scores and the results of the existing individual management body of each of these structures. The main research instruments used in this case study were the documental analyses and semi-structured interviews with the main authors of the formulation and implementation process for the planning and management of the company, beyond the direct observation of these process. The paper accomplishes its goals and brings results and proposals that perceive a continuous development of the Performance Management system in the engineering department of Petrobras.
url http://revistagep.org/ojs/index.php/gep/article/view/14
work_keys_str_mv AT antoniocarlosdelemosoliveira deploymentofgoalsandprojectperformancemanagementcasestudyintheengineeringdepartmentofpetrobras
AT leonardorabellodasilva deploymentofgoalsandprojectperformancemanagementcasestudyintheengineeringdepartmentofpetrobras
AT lucianamouraotemporal deploymentofgoalsandprojectperformancemanagementcasestudyintheengineeringdepartmentofpetrobras
AT glaitonserafim deploymentofgoalsandprojectperformancemanagementcasestudyintheengineeringdepartmentofpetrobras
AT oscarpedroamaralmartins deploymentofgoalsandprojectperformancemanagementcasestudyintheengineeringdepartmentofpetrobras
_version_ 1725112065978269696