Research and Application of Digital Positive Concerted Design for Overseas 9H Gas Turbine Project
[Introduction] At present, investors in the power market have an increasing demand for digitization and intelligence of thermal power generation projects. Especially, overseas projects have put forward new requirements for the integrity and timeliness of digital design. Therefore, how to integrate t...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Energy Observer Magazine Co., Ltd.
2021-06-01
|
Series: | 南方能源建设 |
Subjects: | |
Online Access: | https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2021.02.001 |
id |
doaj-b1c073e7fb15409caba7bf533be6180a |
---|---|
record_format |
Article |
spelling |
doaj-b1c073e7fb15409caba7bf533be6180a2021-08-18T02:24:18ZengEnergy Observer Magazine Co., Ltd.南方能源建设2095-86762021-06-018211010.16516/j.gedi.issn2095-8676.2021.02.001Research and Application of Digital Positive Concerted Design for Overseas 9H Gas Turbine ProjectLÜ Xiaolan0ZHENG Chunhua1ZHENG Zhaoying2ZHENG Binling3ZHONG Weilong4China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, ChinaChina Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, ChinaChina Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, ChinaChina Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, ChinaChina Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, China[Introduction] At present, investors in the power market have an increasing demand for digitization and intelligence of thermal power generation projects. Especially, overseas projects have put forward new requirements for the integrity and timeliness of digital design. Therefore, how to integrate the existing platform and data to form an effective implementation plan for digital collaborative design of thermal power plants has become an important issue faced by power design enterprises. [Method] This paper took Unique project in Bangladesh as the application object, and put forward a complete solution through case analysis, demand analysis, secondary development, standard digitization and other means. The scheme took the digital positive design as the overall requirement and constructed a set of basic database suitable for international engineering project. Through deep secondary development and integration, the whole process from system design, layout design to civil engineering design and drawing output was opened up. The basic platform such as the integrated design platform of process and civil engineering had been improved. The digital positive design of the project was realized. [Result] Through the in-depth application, the barrier of digital design information isolated island is broken by technical means, and the positive and full connection of data is realized, which improves the cooperation and drawing output efficiency of the upstream and downstream. [Conclusion] The practical results of the project prove that the scheme is scientific and efficient, which provides a reference solution for the digital positive design of thermal power plants.https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2021.02.001h-class gas turbine combined cycle power generationbasic databasedata barrierdigital positive concerted design |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
LÜ Xiaolan ZHENG Chunhua ZHENG Zhaoying ZHENG Binling ZHONG Weilong |
spellingShingle |
LÜ Xiaolan ZHENG Chunhua ZHENG Zhaoying ZHENG Binling ZHONG Weilong Research and Application of Digital Positive Concerted Design for Overseas 9H Gas Turbine Project 南方能源建设 h-class gas turbine combined cycle power generation basic database data barrier digital positive concerted design |
author_facet |
LÜ Xiaolan ZHENG Chunhua ZHENG Zhaoying ZHENG Binling ZHONG Weilong |
author_sort |
LÜ Xiaolan |
title |
Research and Application of Digital Positive Concerted Design for Overseas 9H Gas Turbine Project |
title_short |
Research and Application of Digital Positive Concerted Design for Overseas 9H Gas Turbine Project |
title_full |
Research and Application of Digital Positive Concerted Design for Overseas 9H Gas Turbine Project |
title_fullStr |
Research and Application of Digital Positive Concerted Design for Overseas 9H Gas Turbine Project |
title_full_unstemmed |
Research and Application of Digital Positive Concerted Design for Overseas 9H Gas Turbine Project |
title_sort |
research and application of digital positive concerted design for overseas 9h gas turbine project |
publisher |
Energy Observer Magazine Co., Ltd. |
series |
南方能源建设 |
issn |
2095-8676 |
publishDate |
2021-06-01 |
description |
[Introduction] At present, investors in the power market have an increasing demand for digitization and intelligence of thermal power generation projects. Especially, overseas projects have put forward new requirements for the integrity and timeliness of digital design. Therefore, how to integrate the existing platform and data to form an effective implementation plan for digital collaborative design of thermal power plants has become an important issue faced by power design enterprises. [Method] This paper took Unique project in Bangladesh as the application object, and put forward a complete solution through case analysis, demand analysis, secondary development, standard digitization and other means. The scheme took the digital positive design as the overall requirement and constructed a set of basic database suitable for international engineering project. Through deep secondary development and integration, the whole process from system design, layout design to civil engineering design and drawing output was opened up. The basic platform such as the integrated design platform of process and civil engineering had been improved. The digital positive design of the project was realized. [Result] Through the in-depth application, the barrier of digital design information isolated island is broken by technical means, and the positive and full connection of data is realized, which improves the cooperation and drawing output efficiency of the upstream and downstream. [Conclusion] The practical results of the project prove that the scheme is scientific and efficient, which provides a reference solution for the digital positive design of thermal power plants. |
topic |
h-class gas turbine combined cycle power generation basic database data barrier digital positive concerted design |
url |
https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2021.02.001 |
work_keys_str_mv |
AT luxiaolan researchandapplicationofdigitalpositiveconcerteddesignforoverseas9hgasturbineproject AT zhengchunhua researchandapplicationofdigitalpositiveconcerteddesignforoverseas9hgasturbineproject AT zhengzhaoying researchandapplicationofdigitalpositiveconcerteddesignforoverseas9hgasturbineproject AT zhengbinling researchandapplicationofdigitalpositiveconcerteddesignforoverseas9hgasturbineproject AT zhongweilong researchandapplicationofdigitalpositiveconcerteddesignforoverseas9hgasturbineproject |
_version_ |
1721204119826333696 |