Thermal Stressed State in Massive Concrete Structures in the Winter Building Period

The article deals with issues of the thermal cracking resistance in massive concrete and reinforced concrete structures during the building period. The paper gives the calculation results of thermal stressed state in massive foundation slabs with different time organization of the thermal protection...

Full description

Bibliographic Details
Main Authors: Korotchenko Ivan, Ivanov Ernest, Semenov Kirill, Barabanshchikov Yuri
Format: Article
Language:English
Published: EDP Sciences 2016-01-01
Series:MATEC Web of Conferences
Online Access:http://dx.doi.org/10.1051/matecconf/20165301001
id doaj-b124f3e861e84d3687358d94589841d4
record_format Article
spelling doaj-b124f3e861e84d3687358d94589841d42021-02-02T05:23:14ZengEDP SciencesMATEC Web of Conferences2261-236X2016-01-01530100110.1051/matecconf/20165301001matecconf_spbwosce2016_01001Thermal Stressed State in Massive Concrete Structures in the Winter Building PeriodKorotchenko Ivan0Ivanov Ernest1Semenov Kirill2Barabanshchikov Yuri3St. Petersburg State Polytechnical University, Institute of Civil EngineeringSt. Petersburg State Polytechnical University, Institute of Civil EngineeringSt. Petersburg State Polytechnical University, Institute of Civil EngineeringSt. Petersburg State Polytechnical University, Institute of Civil EngineeringThe article deals with issues of the thermal cracking resistance in massive concrete and reinforced concrete structures during the building period. The paper gives the calculation results of thermal stressed state in massive foundation slabs with different time organization of the thermal protection. It was found that the thermal crack resistance is fully guaranteed when the insulation is installed immediately after concrete has been placed or it has been placed with short delay. The delay can be allowed if the relative tensile strain of the concrete does not exceed the tensility limit. The acceptable delay ranges from 8 to 30% of time it takes to reach the maximum temperature in the concrete block. The surface insulation installation at the time of the temperature peak inevitably leads to the formation and development of cracks.http://dx.doi.org/10.1051/matecconf/20165301001
collection DOAJ
language English
format Article
sources DOAJ
author Korotchenko Ivan
Ivanov Ernest
Semenov Kirill
Barabanshchikov Yuri
spellingShingle Korotchenko Ivan
Ivanov Ernest
Semenov Kirill
Barabanshchikov Yuri
Thermal Stressed State in Massive Concrete Structures in the Winter Building Period
MATEC Web of Conferences
author_facet Korotchenko Ivan
Ivanov Ernest
Semenov Kirill
Barabanshchikov Yuri
author_sort Korotchenko Ivan
title Thermal Stressed State in Massive Concrete Structures in the Winter Building Period
title_short Thermal Stressed State in Massive Concrete Structures in the Winter Building Period
title_full Thermal Stressed State in Massive Concrete Structures in the Winter Building Period
title_fullStr Thermal Stressed State in Massive Concrete Structures in the Winter Building Period
title_full_unstemmed Thermal Stressed State in Massive Concrete Structures in the Winter Building Period
title_sort thermal stressed state in massive concrete structures in the winter building period
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2016-01-01
description The article deals with issues of the thermal cracking resistance in massive concrete and reinforced concrete structures during the building period. The paper gives the calculation results of thermal stressed state in massive foundation slabs with different time organization of the thermal protection. It was found that the thermal crack resistance is fully guaranteed when the insulation is installed immediately after concrete has been placed or it has been placed with short delay. The delay can be allowed if the relative tensile strain of the concrete does not exceed the tensility limit. The acceptable delay ranges from 8 to 30% of time it takes to reach the maximum temperature in the concrete block. The surface insulation installation at the time of the temperature peak inevitably leads to the formation and development of cracks.
url http://dx.doi.org/10.1051/matecconf/20165301001
work_keys_str_mv AT korotchenkoivan thermalstressedstateinmassiveconcretestructuresinthewinterbuildingperiod
AT ivanovernest thermalstressedstateinmassiveconcretestructuresinthewinterbuildingperiod
AT semenovkirill thermalstressedstateinmassiveconcretestructuresinthewinterbuildingperiod
AT barabanshchikovyuri thermalstressedstateinmassiveconcretestructuresinthewinterbuildingperiod
_version_ 1724303764089733120