Thermal Stressed State in Massive Concrete Structures in the Winter Building Period
The article deals with issues of the thermal cracking resistance in massive concrete and reinforced concrete structures during the building period. The paper gives the calculation results of thermal stressed state in massive foundation slabs with different time organization of the thermal protection...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2016-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | http://dx.doi.org/10.1051/matecconf/20165301001 |
id |
doaj-b124f3e861e84d3687358d94589841d4 |
---|---|
record_format |
Article |
spelling |
doaj-b124f3e861e84d3687358d94589841d42021-02-02T05:23:14ZengEDP SciencesMATEC Web of Conferences2261-236X2016-01-01530100110.1051/matecconf/20165301001matecconf_spbwosce2016_01001Thermal Stressed State in Massive Concrete Structures in the Winter Building PeriodKorotchenko Ivan0Ivanov Ernest1Semenov Kirill2Barabanshchikov Yuri3St. Petersburg State Polytechnical University, Institute of Civil EngineeringSt. Petersburg State Polytechnical University, Institute of Civil EngineeringSt. Petersburg State Polytechnical University, Institute of Civil EngineeringSt. Petersburg State Polytechnical University, Institute of Civil EngineeringThe article deals with issues of the thermal cracking resistance in massive concrete and reinforced concrete structures during the building period. The paper gives the calculation results of thermal stressed state in massive foundation slabs with different time organization of the thermal protection. It was found that the thermal crack resistance is fully guaranteed when the insulation is installed immediately after concrete has been placed or it has been placed with short delay. The delay can be allowed if the relative tensile strain of the concrete does not exceed the tensility limit. The acceptable delay ranges from 8 to 30% of time it takes to reach the maximum temperature in the concrete block. The surface insulation installation at the time of the temperature peak inevitably leads to the formation and development of cracks.http://dx.doi.org/10.1051/matecconf/20165301001 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Korotchenko Ivan Ivanov Ernest Semenov Kirill Barabanshchikov Yuri |
spellingShingle |
Korotchenko Ivan Ivanov Ernest Semenov Kirill Barabanshchikov Yuri Thermal Stressed State in Massive Concrete Structures in the Winter Building Period MATEC Web of Conferences |
author_facet |
Korotchenko Ivan Ivanov Ernest Semenov Kirill Barabanshchikov Yuri |
author_sort |
Korotchenko Ivan |
title |
Thermal Stressed State in Massive Concrete Structures in the Winter Building Period |
title_short |
Thermal Stressed State in Massive Concrete Structures in the Winter Building Period |
title_full |
Thermal Stressed State in Massive Concrete Structures in the Winter Building Period |
title_fullStr |
Thermal Stressed State in Massive Concrete Structures in the Winter Building Period |
title_full_unstemmed |
Thermal Stressed State in Massive Concrete Structures in the Winter Building Period |
title_sort |
thermal stressed state in massive concrete structures in the winter building period |
publisher |
EDP Sciences |
series |
MATEC Web of Conferences |
issn |
2261-236X |
publishDate |
2016-01-01 |
description |
The article deals with issues of the thermal cracking resistance in massive concrete and reinforced concrete structures during the building period. The paper gives the calculation results of thermal stressed state in massive foundation slabs with different time organization of the thermal protection. It was found that the thermal crack resistance is fully guaranteed when the insulation is installed immediately after concrete has been placed or it has been placed with short delay. The delay can be allowed if the relative tensile strain of the concrete does not exceed the tensility limit. The acceptable delay ranges from 8 to 30% of time it takes to reach the maximum temperature in the concrete block. The surface insulation installation at the time of the temperature peak inevitably leads to the formation and development of cracks. |
url |
http://dx.doi.org/10.1051/matecconf/20165301001 |
work_keys_str_mv |
AT korotchenkoivan thermalstressedstateinmassiveconcretestructuresinthewinterbuildingperiod AT ivanovernest thermalstressedstateinmassiveconcretestructuresinthewinterbuildingperiod AT semenovkirill thermalstressedstateinmassiveconcretestructuresinthewinterbuildingperiod AT barabanshchikovyuri thermalstressedstateinmassiveconcretestructuresinthewinterbuildingperiod |
_version_ |
1724303764089733120 |