Summary: | The relevance of implementing BIM technologies at all stages of the building's life cycle from design to decision-making on its demolition is shown. Variants of the stress-strain state of buildings and structures are considered. An algorithm for analyzing incoming information and making decisions about major repairs, reconstruction, or demolition of an object is developed, depending on the values of parameters, their duration, and combinations obtained from sensors installed during their construction. The use of fiber-optic sensors for obtaining information and subsequent analysis of the state of the building structure and determining dangerous movements of its individual elements is proposed.
|