WAKTU PENYELESAIAN PROYEK KONSTRUKSI MENGGUNAKAN PRECEDENCE DIAGRAM METHOD DAN LINE OF BALANCE
Project is any work that has a beginning and ending, consisting of several jobs/activities that must be carried out in a certain order. Contractors typically use the Gantt Chart Method in scheduling home construction projects so that it is difficult to know the impact caused by the late completion o...
Main Authors: | I WAYAN YOGA ASTAWA, NI KETUT TARI TASTRAWATI, LUH PUTU IDA HARINI |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Udayana
2020-09-01
|
Series: | E-Jurnal Matematika |
Online Access: | https://ojs.unud.ac.id/index.php/mtk/article/view/63764 |
Similar Items
-
OPTIMASI WAKTU PROYEK DENGAN PENAMBAHAN JAM KERJA DENGAN PRECEDENCE DIAGRAM METHOD (Studi Kasus Proyek Rumah Susun Sederhana Sewa Pekanbaru)
by: Desi Yasri
Published: (2015-10-01) -
PERAMALAN PERSEDIAAN INFUS MENGGUNAKAN METODE AUTOREGRESSIVE INTEGRATED MOVING AVERAGE (ARIMA) PADA RUMAH SAKIT UMUM PUSAT SANGLAH
by: I PUTU YUDI PRABHADIKA, et al.
Published: (2018-05-01) -
Analisis Waktu Pelaksanaan Proyek Konstruksi dengan Variasi Penambahan Jam Kerja
by: Mandiyo Priyo, et al.
Published: (2015-11-01) -
KAJIAN PENGELOLAAN LIMBAH KONSTRUKSI PADA PROYEK PEMBANGUNAN GEDUNG DI BALI
by: Ida Ayu Rai Widhiawati, et al.
Published: (2019-01-01) -
ANALISA PENGARUH PENGENDALIAN KINERJA PROYEK TERHADAP MUTU PROYEK KONSTRUKSI DENGAN MENGGUNAKAN UJI STATISTIKA
by: Fatchur Rochman, et al.
Published: (2017-03-01)