Bond strength of hot – dip galvanized reinforcement (B500B) with concrete
This paper evaluates the effect of initial corrosion damage to the surface of the hot - dip galvanized steel coating in fresh concrete on its final bond strength. The tests were performed on uncoated and hot-dip galvanized ribbed reinforcements. The measurement of bond stress (τ<sub>m</sub&...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Croatian Metallurgical Society
2016-07-01
|
Series: | Metalurgija |
Subjects: | |
Online Access: | http://hrcak.srce.hr/file/226313 |
id |
doaj-adc10c75f9994dca91765212ba466c16 |
---|---|
record_format |
Article |
spelling |
doaj-adc10c75f9994dca91765212ba466c162020-11-24T23:48:28ZengCroatian Metallurgical SocietyMetalurgija0543-58461334-25762016-07-01553337340Bond strength of hot – dip galvanized reinforcement (B500B) with concrete P. PokornýD. DobiášM. VokáčThis paper evaluates the effect of initial corrosion damage to the surface of the hot - dip galvanized steel coating in fresh concrete on its final bond strength. The tests were performed on uncoated and hot-dip galvanized ribbed reinforcements. The measurement of bond stress (τ<sub>m</sub>) according to the standard procedure (ASTM C234; ČSN 73 1328) revealed decreased bond strength of the coated reinforcement. Both types of reinforcement exhibit similar values of maximum shear stress (τ). To make some general conclusion, the bond strength also needs to be verified on smooth profiles.http://hrcak.srce.hr/file/226313corrosionsteelhot-dip galvanized coatingpull – out testASTM C234 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
P. Pokorný D. Dobiáš M. Vokáč |
spellingShingle |
P. Pokorný D. Dobiáš M. Vokáč Bond strength of hot – dip galvanized reinforcement (B500B) with concrete Metalurgija corrosion steel hot-dip galvanized coating pull – out test ASTM C234 |
author_facet |
P. Pokorný D. Dobiáš M. Vokáč |
author_sort |
P. Pokorný |
title |
Bond strength of hot – dip galvanized reinforcement (B500B) with concrete |
title_short |
Bond strength of hot – dip galvanized reinforcement (B500B) with concrete |
title_full |
Bond strength of hot – dip galvanized reinforcement (B500B) with concrete |
title_fullStr |
Bond strength of hot – dip galvanized reinforcement (B500B) with concrete |
title_full_unstemmed |
Bond strength of hot – dip galvanized reinforcement (B500B) with concrete |
title_sort |
bond strength of hot – dip galvanized reinforcement (b500b) with concrete |
publisher |
Croatian Metallurgical Society |
series |
Metalurgija |
issn |
0543-5846 1334-2576 |
publishDate |
2016-07-01 |
description |
This paper evaluates the effect of initial corrosion damage to the surface of the hot - dip galvanized steel coating in fresh concrete on its final bond strength. The tests were performed on uncoated and hot-dip galvanized ribbed reinforcements. The measurement of bond stress (τ<sub>m</sub>) according to the standard procedure (ASTM C234; ČSN 73 1328) revealed decreased bond strength of the coated reinforcement. Both types of reinforcement exhibit similar values of maximum shear stress (τ). To make some general conclusion, the bond strength also needs to be verified on smooth profiles. |
topic |
corrosion steel hot-dip galvanized coating pull – out test ASTM C234 |
url |
http://hrcak.srce.hr/file/226313 |
work_keys_str_mv |
AT ppokorny bondstrengthofhotdipgalvanizedreinforcementb500bwithconcrete AT ddobias bondstrengthofhotdipgalvanizedreinforcementb500bwithconcrete AT mvokac bondstrengthofhotdipgalvanizedreinforcementb500bwithconcrete |
_version_ |
1725486044424437760 |