Risk Assessment in PPP Projects by Applying Different MCDM Methods and Comparative Results Analysis
Recently, risk assessment has become one of the most challenging issues in the areas of construction and public-private partnerships (PPPs). To address risk assessment issues, various decision-making techniques have been proposed, each with its own specific disadvantages and advantages. This paper i...
Main Authors: | Alireza Valipour, Hadi Sarvari, Jolanta Tamošaitiene |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-12-01
|
Series: | Administrative Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3387/8/4/80 |
Similar Items
-
A SWARA-COPRAS approach to the allocation of risk in water and sewerage public–private partnership projects in Malaysia
by: Alireza Valipour, et al.
Published: (2019-03-01) -
Hybrid SWARA-COPRAS method for risk assessment in deep foundation excavation project: an iranian case study
by: Alireza Valipour, et al.
Published: (2017-04-01) -
Development and Optimization of Hybrid Friction Materials Consisting of Nanoclay and Carbon Nanotubes by using Analytical Hierarchy Process (AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) under Fuzzy Atmosphere
by: Tej SINGH, et al.
Published: (2013-07-01) -
Application of Hexagonal Fuzzy MCDM Methodology for Site Selection of Electric Vehicle Charging Station
by: Arijit Ghosh, et al.
Published: (2021-02-01) -
A Sequential Solution with MCDM Methods at the Motor-Yacht Construction Problem
by: Ganimet Nilay
Published: (2021-09-01)