SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS
The problems of scheduling and optimization of operational conditions in multistage, multiproduct continuous plants with intermediate storage are simultaneously addressed. An MINLP model, called TSPFLOW, which is based on the TSP formulation for product sequencing, is proposed to schedule the operat...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Brazilian Society of Chemical Engineering
2002-03-01
|
Series: | Brazilian Journal of Chemical Engineering |
Subjects: | |
Online Access: | http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0104-66322002000100003&lng=en&tlng=en |
id |
doaj-ac862f6d93fd436eaa6f0d38e956785c |
---|---|
record_format |
Article |
spelling |
doaj-ac862f6d93fd436eaa6f0d38e956785c2020-11-24T23:08:39ZengBrazilian Society of Chemical EngineeringBrazilian Journal of Chemical Engineering0104-66322002-03-01191254410.1590/S0104-66322002000100003S0104-66322002000100003SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTSA. Alle0J.M. Pinto1Universidade de São PauloUniversidade de São PauloThe problems of scheduling and optimization of operational conditions in multistage, multiproduct continuous plants with intermediate storage are simultaneously addressed. An MINLP model, called TSPFLOW, which is based on the TSP formulation for product sequencing, is proposed to schedule the operation of such plants. TSPFLOW yields a one-order-of-magnitude CPU time reduction as well as the solution of instances larger than those formerly reported (Pinto and Grossmann, 1994). Secondly, processing rates and yields are introduced as additional optimization variables in order to state the simultaneous problem of scheduling with operational optimization. Results show that trade-offs are very complex and that the development of a straightforward (rule of thumb) method to optimally schedule the operation is less effective than the proposed approach.http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0104-66322002000100003&lng=en&tlng=enSchedulingOperationMixed-Integer OptimizationContinuous Plants |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
A. Alle J.M. Pinto |
spellingShingle |
A. Alle J.M. Pinto SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS Brazilian Journal of Chemical Engineering Scheduling Operation Mixed-Integer Optimization Continuous Plants |
author_facet |
A. Alle J.M. Pinto |
author_sort |
A. Alle |
title |
SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS |
title_short |
SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS |
title_full |
SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS |
title_fullStr |
SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS |
title_full_unstemmed |
SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS |
title_sort |
simultaneous scheduling and operational optimization of multiproduct, cyclic continuous plants |
publisher |
Brazilian Society of Chemical Engineering |
series |
Brazilian Journal of Chemical Engineering |
issn |
0104-6632 |
publishDate |
2002-03-01 |
description |
The problems of scheduling and optimization of operational conditions in multistage, multiproduct continuous plants with intermediate storage are simultaneously addressed. An MINLP model, called TSPFLOW, which is based on the TSP formulation for product sequencing, is proposed to schedule the operation of such plants. TSPFLOW yields a one-order-of-magnitude CPU time reduction as well as the solution of instances larger than those formerly reported (Pinto and Grossmann, 1994). Secondly, processing rates and yields are introduced as additional optimization variables in order to state the simultaneous problem of scheduling with operational optimization. Results show that trade-offs are very complex and that the development of a straightforward (rule of thumb) method to optimally schedule the operation is less effective than the proposed approach. |
topic |
Scheduling Operation Mixed-Integer Optimization Continuous Plants |
url |
http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0104-66322002000100003&lng=en&tlng=en |
work_keys_str_mv |
AT aalle simultaneousschedulingandoperationaloptimizationofmultiproductcycliccontinuousplants AT jmpinto simultaneousschedulingandoperationaloptimizationofmultiproductcycliccontinuousplants |
_version_ |
1725613133790183424 |