RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN
In Anieș basin, first torrential correction works were carried out in 1988, on Butucilor Stream, with waiver of narrow gauge forest railways and open forest road Anieș. This work consisted of two thresholds in performance with a height of 2 meters, connected together by trapezoidal drains and the...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
AcademicPres
2012-12-01
|
Series: | Agricultura |
Online Access: | http://journals.usamvcluj.ro/index.php/agricultura/article/view/9085 |
id |
doaj-ab7a3189343644a79557d7e1e5350179 |
---|---|
record_format |
Article |
spelling |
doaj-ab7a3189343644a79557d7e1e53501792021-09-02T02:01:16ZengAcademicPresAgricultura1221-53172012-12-01833-410.15835/arspa.v83i3-4.90857975RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASINL. Pupeza0M. Dirja1T. Salagean2Adela Hoble3University of Agricultural Science and Veterinary Medicine, Cluj-NapocaUniversity of Agricultural Science and Veterinary Medicine, Cluj-NapocaUniversity of Agricultural Science and Veterinary Medicine, Cluj-NapocaUniversity of Agricultural Science and Veterinary Medicine, Cluj-NapocaIn Anieș basin, first torrential correction works were carried out in 1988, on Butucilor Stream, with waiver of narrow gauge forest railways and open forest road Anieș. This work consisted of two thresholds in performance with a height of 2 meters, connected together by trapezoidal drains and the upstream side of a dam with a height of 6 feet with 2 drain holes that could close using metal gates. The works were made ​​of stone masonry with cement mortar. In the next phase, the years 1988-1997 were executed torrential correction works upstream the Butucilor Stream, on the streams DeluÅ£ului, Brazilor and Lupilor, consisting of a dam with a height of 3 meters and a channel connection. These works were well behaved, but after repeated floods in the basin, silt transported have exhausted retention capacity and currently works cross some channels are clogged drain, sometimes being destroyed masonry, is even installing vegetation on the shoulders dams. Currently, due to dynamic torrential processes, torrential correction action on Anieș basin, continuous, Mihăiasa Valley is a complex process of restoration and is running a number of 5 dams with heights between 2 and 3.5 meters, from which 2 filterable, 6 thresholds and 9 sleepers.http://journals.usamvcluj.ro/index.php/agricultura/article/view/9085 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
L. Pupeza M. Dirja T. Salagean Adela Hoble |
spellingShingle |
L. Pupeza M. Dirja T. Salagean Adela Hoble RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN Agricultura |
author_facet |
L. Pupeza M. Dirja T. Salagean Adela Hoble |
author_sort |
L. Pupeza |
title |
RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN |
title_short |
RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN |
title_full |
RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN |
title_fullStr |
RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN |
title_full_unstemmed |
RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN |
title_sort |
research on behavior of torrential correction works in the anieåž hydrographic basin |
publisher |
AcademicPres |
series |
Agricultura |
issn |
1221-5317 |
publishDate |
2012-12-01 |
description |
In Anieș basin, first torrential correction works were carried out in 1988, on Butucilor Stream, with waiver of narrow gauge forest railways and open forest road Anieș. This work consisted of two thresholds in performance with a height of 2 meters, connected together by trapezoidal drains and the upstream side of a dam with a height of 6 feet with 2 drain holes that could close using metal gates. The works were made ​​of stone masonry with cement mortar. In the next phase, the years 1988-1997 were executed torrential correction works upstream the Butucilor Stream, on the streams DeluÅ£ului, Brazilor and Lupilor, consisting of a dam with a height of 3 meters and a channel connection. These works were well behaved, but after repeated floods in the basin, silt transported have exhausted retention capacity and currently works cross some channels are clogged drain, sometimes being destroyed masonry, is even installing vegetation on the shoulders dams. Currently, due to dynamic torrential processes, torrential correction action on Anieș basin, continuous, Mihăiasa Valley is a complex process of restoration and is running a number of 5 dams with heights between 2 and 3.5 meters, from which 2 filterable, 6 thresholds and 9 sleepers. |
url |
http://journals.usamvcluj.ro/index.php/agricultura/article/view/9085 |
work_keys_str_mv |
AT lpupeza researchonbehavioroftorrentialcorrectionworksintheanieazhydrographicbasin AT mdirja researchonbehavioroftorrentialcorrectionworksintheanieazhydrographicbasin AT tsalagean researchonbehavioroftorrentialcorrectionworksintheanieazhydrographicbasin AT adelahoble researchonbehavioroftorrentialcorrectionworksintheanieazhydrographicbasin |
_version_ |
1721181613539196928 |