RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN

In Anieș basin, first torrential correction works were carried out in 1988, on  Butucilor Stream, with waiver of narrow gauge forest railways and open forest road Anieș. This work consisted of two thresholds in performance with a height of 2 meters, connected together by trapezoidal drains and the...

Full description

Bibliographic Details
Main Authors: L. Pupeza, M. Dirja, T. Salagean, Adela Hoble
Format: Article
Language:English
Published: AcademicPres 2012-12-01
Series:Agricultura
Online Access:http://journals.usamvcluj.ro/index.php/agricultura/article/view/9085
id doaj-ab7a3189343644a79557d7e1e5350179
record_format Article
spelling doaj-ab7a3189343644a79557d7e1e53501792021-09-02T02:01:16ZengAcademicPresAgricultura1221-53172012-12-01833-410.15835/arspa.v83i3-4.90857975RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASINL. Pupeza0M. Dirja1T. Salagean2Adela Hoble3University of Agricultural Science and Veterinary Medicine, Cluj-NapocaUniversity of Agricultural Science and Veterinary Medicine, Cluj-NapocaUniversity of Agricultural Science and Veterinary Medicine, Cluj-NapocaUniversity of Agricultural Science and Veterinary Medicine, Cluj-NapocaIn Anieș basin, first torrential correction works were carried out in 1988, on  Butucilor Stream, with waiver of narrow gauge forest railways and open forest road Anieș. This work consisted of two thresholds in performance with a height of 2 meters, connected together by trapezoidal drains and the upstream side of a dam with a height of 6 feet with 2 drain holes that could close using metal gates. The works were made ​​of stone masonry with cement mortar. In the next phase, the years 1988-1997 were executed torrential correction works upstream the Butucilor Stream, on the streams DeluÅ£ului, Brazilor and Lupilor, consisting of a dam with a height of 3 meters and a channel connection. These works were well behaved, but after repeated floods in the basin, silt transported have exhausted retention capacity and currently works cross some channels are clogged drain, sometimes being destroyed masonry, is even installing vegetation on the shoulders dams. Currently, due to dynamic torrential processes, torrential correction action on Anieș basin, continuous,  Mihăiasa Valley is a complex process of restoration and is running a number of 5 dams with heights between 2 and 3.5 meters, from which 2 filterable, 6 thresholds and 9 sleepers.http://journals.usamvcluj.ro/index.php/agricultura/article/view/9085
collection DOAJ
language English
format Article
sources DOAJ
author L. Pupeza
M. Dirja
T. Salagean
Adela Hoble
spellingShingle L. Pupeza
M. Dirja
T. Salagean
Adela Hoble
RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN
Agricultura
author_facet L. Pupeza
M. Dirja
T. Salagean
Adela Hoble
author_sort L. Pupeza
title RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN
title_short RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN
title_full RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN
title_fullStr RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN
title_full_unstemmed RESEARCH ON BEHAVIOR OF TORRENTIAL CORRECTION WORKS IN THE ANIEÅž HYDROGRAPHIC BASIN
title_sort research on behavior of torrential correction works in the anieåž hydrographic basin
publisher AcademicPres
series Agricultura
issn 1221-5317
publishDate 2012-12-01
description In Anieș basin, first torrential correction works were carried out in 1988, on  Butucilor Stream, with waiver of narrow gauge forest railways and open forest road Anieș. This work consisted of two thresholds in performance with a height of 2 meters, connected together by trapezoidal drains and the upstream side of a dam with a height of 6 feet with 2 drain holes that could close using metal gates. The works were made ​​of stone masonry with cement mortar. In the next phase, the years 1988-1997 were executed torrential correction works upstream the Butucilor Stream, on the streams DeluÅ£ului, Brazilor and Lupilor, consisting of a dam with a height of 3 meters and a channel connection. These works were well behaved, but after repeated floods in the basin, silt transported have exhausted retention capacity and currently works cross some channels are clogged drain, sometimes being destroyed masonry, is even installing vegetation on the shoulders dams. Currently, due to dynamic torrential processes, torrential correction action on Anieș basin, continuous,  Mihăiasa Valley is a complex process of restoration and is running a number of 5 dams with heights between 2 and 3.5 meters, from which 2 filterable, 6 thresholds and 9 sleepers.
url http://journals.usamvcluj.ro/index.php/agricultura/article/view/9085
work_keys_str_mv AT lpupeza researchonbehavioroftorrentialcorrectionworksintheanieazhydrographicbasin
AT mdirja researchonbehavioroftorrentialcorrectionworksintheanieazhydrographicbasin
AT tsalagean researchonbehavioroftorrentialcorrectionworksintheanieazhydrographicbasin
AT adelahoble researchonbehavioroftorrentialcorrectionworksintheanieazhydrographicbasin
_version_ 1721181613539196928