A new tool for the drying time and the moisture risk estimation in concrete floors

Moisture management in building site has improved significantly in recent years. However, problems with concrete floors are repeatedly found. One possible reason for the failure may be that the time required for adequate drying of the concrete has not been properly considered when scheduling the bui...

Full description

Bibliographic Details
Main Authors: Sekki Pauli, Marttila Pasi, Merikallio Tarja
Format: Article
Language:English
Published: EDP Sciences 2020-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/32/e3sconf_nsb2020_04011.pdf

Similar Items