Technical and Economic Efficiency of ТРБ-Turbine Application for Utilization of Steam Potential Lost due to Throttling at Industrial and Heating Boiler-Houses and Thermal Power Stations
The paper contains information on main results of introduction of the first two Byelorussian ТРБ-model steam turbines. The experience of their operation fully corroborates the correctness of technical solutions that form the basis of their design. The paper reveals that ТРБ turbines of its class are...
Main Authors: | A. K. Balabanovich, N. N. Skorobogatij, E. A. Pantdej, N. V. Pantdej, E. V. Kulak |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2004-08-01
|
Series: | Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika |
Online Access: | https://energy.bntu.by/jour/article/view/1157 |
Similar Items
-
К пуску второй белорусской паровой турбины марки ТРБ
Published: (2002-08-01) -
EVALUATION OF TECHNICAL STATE OF GAS TURBINE PLANT ACCORDING TO THE RESULTS OF THE CONSTRUCTION OF THE PIVOT THROTTLE CHARACTERISTICS
by: A. R. Zagretdinov, et al.
Published: (2017-12-01) -
Fuzzy arithmetical modeling of a steam turbine and a boiler system
by: Wan Mohamad, W. M., et al.
Published: (2018) -
Boilers and Steam Distribution Systems; Aspects for Simulation
by: E. N. Martin
Published: (1973-04-01) -
Efficiency of Using the Auxiliary Boiler for Peak Power Generation by a Steam Turbine of NPP
by: V. A. Khrustalev, et al.
Published: (2021-02-01)