Risk analysis and emergency countermeasures for oil pollution in main channel of South to North Water Transfer Project

The total length of the main channel of the South-to-North Water Transfer Project is 1432 kilometers. There are nearly 1, 000 supporting mechanical and electrical equipment along the channel gate station. At the same time, there are more than 1, 000 main roads with channel crossing roads along the r...

Full description

Bibliographic Details
Main Authors: Zhu Jie, Lei Xiaohui, Zheng Hezheng, Liang Jiankui, Quan Jin
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201824602020