Flow shop scheduling problem is to schedule a production process of n jobs that go through the same process sequence and the same m machines. Most researches are don to accomplish only one objective, i.e. minimizing makespan. The other objective, such as total flow time, or multiple objectives that...

Full description

Bibliographic Details
Main Authors: Tessa Vanina Soetanto, Ervin Medianti, Didik Wahyudi
Format: Article
Language:English
Published: Petra Christian University 1999-01-01
Series:Jurnal Teknik Industri
Subjects:
Online Access:http://puslit2.petra.ac.id/ejournal/index.php/ind/article/view/15980
id doaj-ab04c25d895249cea3664982be5a481f
record_format Article
spelling doaj-ab04c25d895249cea3664982be5a481f2020-11-24T23:38:58ZengPetra Christian UniversityJurnal Teknik Industri1411-24851999-01-01114150PERBANDINGAN KINERJA ALGORITMA GENETIKA DAN ALGORITMA HEURISTIK RAJENDRAN UNTUK PENJADUALAN PRODUKSI JENIS FLOW SHOPTessa Vanina SoetantoErvin MediantiDidik WahyudiFlow shop scheduling problem is to schedule a production process of n jobs that go through the same process sequence and the same m machines. Most researches are don to accomplish only one objective, i.e. minimizing makespan. The other objective, such as total flow time, or multiple objectives that is minimizing makespan, total flow time and machine idle time, will be more effective in reducing scheduling cost, as written in French (1982). Rajendran algorithm (1995) that solves flow shop problem with multiple objectives will be used to evaluate the proposed algorithm: Genetic Algorithm, developed by Sridhar & Rajendran (1996) on a problem that existed in a shoe factory. Abstract in Bahasa Indonesia : Masalah penjadualan flow shop adalah menjadualkan proses produksi dari masing-masing n job yang mempunyai urutan proses produksi dan melalui m mesin yang sama. Kebanyakan penelitian hanya mengacu pada satu tujuan saja yaitu meminimumkan makespan. Tujuan yang lain, seperti meminimumkan total flow time atau multiple objectives yang meminimumkan makespan, total flow time dan machine idle time akan lebih efektif dalam mengurangi biaya penjadualan, sebagaimana dikatakan oleh French (1982). Algoritma Rajendran (1995) yang menyelesaikan masalah flow shop dengan multiple objectives akan dipergunakan untuk mengevaluasi algoritma usulan: Algoritma Genetika, yang dikembangkan oleh Sridhar & Rajendran (1996) pada suatu masalah yang ditemui di suatu perusahaan sepatu. Kata kunci: flow shop, algoritma genetika, multiple objectives http://puslit2.petra.ac.id/ejournal/index.php/ind/article/view/15980flow shopgenetic algorithmmultiple objectives
collection DOAJ
language English
format Article
sources DOAJ
author Tessa Vanina Soetanto
Ervin Medianti
Didik Wahyudi
spellingShingle Tessa Vanina Soetanto
Ervin Medianti
Didik Wahyudi
PERBANDINGAN KINERJA ALGORITMA GENETIKA DAN ALGORITMA HEURISTIK RAJENDRAN UNTUK PENJADUALAN PRODUKSI JENIS FLOW SHOP
Jurnal Teknik Industri
flow shop
genetic algorithm
multiple objectives
author_facet Tessa Vanina Soetanto
Ervin Medianti
Didik Wahyudi
author_sort Tessa Vanina Soetanto
title PERBANDINGAN KINERJA ALGORITMA GENETIKA DAN ALGORITMA HEURISTIK RAJENDRAN UNTUK PENJADUALAN PRODUKSI JENIS FLOW SHOP
title_short PERBANDINGAN KINERJA ALGORITMA GENETIKA DAN ALGORITMA HEURISTIK RAJENDRAN UNTUK PENJADUALAN PRODUKSI JENIS FLOW SHOP
title_full PERBANDINGAN KINERJA ALGORITMA GENETIKA DAN ALGORITMA HEURISTIK RAJENDRAN UNTUK PENJADUALAN PRODUKSI JENIS FLOW SHOP
title_fullStr PERBANDINGAN KINERJA ALGORITMA GENETIKA DAN ALGORITMA HEURISTIK RAJENDRAN UNTUK PENJADUALAN PRODUKSI JENIS FLOW SHOP
title_full_unstemmed PERBANDINGAN KINERJA ALGORITMA GENETIKA DAN ALGORITMA HEURISTIK RAJENDRAN UNTUK PENJADUALAN PRODUKSI JENIS FLOW SHOP
title_sort perbandingan kinerja algoritma genetika dan algoritma heuristik rajendran untuk penjadualan produksi jenis flow shop
publisher Petra Christian University
series Jurnal Teknik Industri
issn 1411-2485
publishDate 1999-01-01
description Flow shop scheduling problem is to schedule a production process of n jobs that go through the same process sequence and the same m machines. Most researches are don to accomplish only one objective, i.e. minimizing makespan. The other objective, such as total flow time, or multiple objectives that is minimizing makespan, total flow time and machine idle time, will be more effective in reducing scheduling cost, as written in French (1982). Rajendran algorithm (1995) that solves flow shop problem with multiple objectives will be used to evaluate the proposed algorithm: Genetic Algorithm, developed by Sridhar & Rajendran (1996) on a problem that existed in a shoe factory. Abstract in Bahasa Indonesia : Masalah penjadualan flow shop adalah menjadualkan proses produksi dari masing-masing n job yang mempunyai urutan proses produksi dan melalui m mesin yang sama. Kebanyakan penelitian hanya mengacu pada satu tujuan saja yaitu meminimumkan makespan. Tujuan yang lain, seperti meminimumkan total flow time atau multiple objectives yang meminimumkan makespan, total flow time dan machine idle time akan lebih efektif dalam mengurangi biaya penjadualan, sebagaimana dikatakan oleh French (1982). Algoritma Rajendran (1995) yang menyelesaikan masalah flow shop dengan multiple objectives akan dipergunakan untuk mengevaluasi algoritma usulan: Algoritma Genetika, yang dikembangkan oleh Sridhar & Rajendran (1996) pada suatu masalah yang ditemui di suatu perusahaan sepatu. Kata kunci: flow shop, algoritma genetika, multiple objectives
topic flow shop
genetic algorithm
multiple objectives
url http://puslit2.petra.ac.id/ejournal/index.php/ind/article/view/15980
work_keys_str_mv AT tessavaninasoetanto perbandingankinerjaalgoritmagenetikadanalgoritmaheuristikrajendranuntukpenjadualanproduksijenisflowshop
AT ervinmedianti perbandingankinerjaalgoritmagenetikadanalgoritmaheuristikrajendranuntukpenjadualanproduksijenisflowshop
AT didikwahyudi perbandingankinerjaalgoritmagenetikadanalgoritmaheuristikrajendranuntukpenjadualanproduksijenisflowshop
_version_ 1725515092487831552