Critical Chain Design Structure Matrix Method for Construction Project Scheduling under Rework Scenarios
Rework risks have been a major challenge in the construction industry that constantly affects project schedules and threatens on-time project completion. Traditional project scheduling methods are not capable of modeling rework relationships between activities and mitigating the impact of resulting...
Main Authors: | Guofeng Ma, Keke Hao, Yu Xiao, Tiancheng Zhu |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2019-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/1595628 |
Similar Items
-
A Novel Method of Developing Construction Projects Schedule under Rework Scenarios
by: Guofeng Ma, et al.
Published: (2019-10-01) -
A DSM-Based CCPM-MPL Representation Method for Project Scheduling under Rework Scenarios
by: Guofeng Ma, et al.
Published: (2021-01-01) -
Causes of rework on building construction projects in Nigeria
by: Aiyetan, A.O.
Published: (2015) -
Rework in highway projects
by: Nuria Forcada, et al.
Published: (2014-07-01) -
The Framework of Applying the Critical Chain to Linear Schedule for Construction Project Management
by: AlejandroMarin, et al.
Published: (2015)