Grouting performance of the Pandan Duri dam shacked by Lombok earthquake 2018

The Pandan Duri dam has an important role in water supply in the East Lombok District. Unfortunately, Lombok Island is located in a relatively high seismic risk area, as earthquakes occurred in 2018 have ruined almost one third of the island and destroyed thousands of buildings. The Pandan Duri dam...

Full description

Bibliographic Details
Main Authors: Agustawijaya Didi S., Wahyudi Muji, Yasa I Wayan, Ashari Keke F., Agustawijaya Ausa R.
Format: Article
Language:English
Published: EDP Sciences 2020-01-01
Series:MATEC Web of Conferences
Online Access:https://www.matec-conferences.org/articles/matecconf/pdf/2020/27/matecconf_icudr2019_02004.pdf
Description
Summary:The Pandan Duri dam has an important role in water supply in the East Lombok District. Unfortunately, Lombok Island is located in a relatively high seismic risk area, as earthquakes occurred in 2018 have ruined almost one third of the island and destroyed thousands of buildings. The Pandan Duri dam is one of many infrastructures shacked by the earthquake. Modelling the dam shows that the grouting installation of the dam has supported the dam after the earthquake. The factor of safety (FoS) of the dam was still 1. 76 after the earthquake for the flood water level conditions; but, the displacements could be significant to the stability of the dam, as the dam might displace up to 1. 64 m. Although, the current grouting support system might provide the stability to the dam during earthquake events, the dam will certainly require further stability enhancement and close monitoring for possible similar events in the future.
ISSN:2261-236X