Integrated Work Breakdown Structure for Shipbuilding on Department Group Machinery Part Zone Block Engine Room
In the work breakdown structure for shipbuilding of machinery outfitting is related to machinery, ducting, hvac & piping, steel work, and insulation. Integrated work breakdown structure is one of the shipbuilding methods involving in management, so that design time is shorter. The ducting, HVAC...
Main Authors: | Wolfgang Busse, Muhammad Badrus Zaman, Pratama Akbar |
---|---|
Format: | Article |
Language: | English |
Published: |
Institut Teknologi Sepuluh Nopember
2021-03-01
|
Series: | International Journal of Marine Engineering Innovation and Research |
Subjects: |
Similar Items
-
Shipbuilding integration
by: Carter, Joanna M.
Published: (2012) -
DIGITAL TRANSFORMATION OF SHIPBUILDING
by: N. D. Dmitriev
Published: (2019-11-01) -
TURKISH SHIPBUILDING INDUSTRY – CHALLENGES AND POTENTIAL
by: Eda Turan, et al.
Published: (2015-12-01) -
Fall and Rise of Polish Shipbuilding Industry
by: Krzysztof Wrobel, et al.
Published: (2016-04-01) -
On the use of aluminium in shipbuilding
by: Aurel – Dan Maimon
Published: (2015-12-01)