A Multi Objective Optimization Approach for Resources Procurement of Bank

Calculating total cast of bank resources procurement methods which include current -free loan deposit, saving interest-free loan deposit, regular and net short-term investment deposit, long-term investment deposit and surety bond cash deposit and presenting their optimal integration require precise...

Full description

Bibliographic Details
Main Authors: amir mohammad-zadeh, naser hamidi, mohammad amin nayebi, yusof ebrahimi-sajas
Format: Article
Language:English
Published: Islamic Azad University, Qazvin Branch 2010-01-01
Series:Journal of Optimization in Industrial Engineering
Subjects:
Online Access:http://www.qjie.ir/article_40_930dac973ec707a479b2589c3aed62a4.pdf
id doaj-a83b6d502c7d4372bae1459d7bef55f6
record_format Article
spelling doaj-a83b6d502c7d4372bae1459d7bef55f62020-11-24T21:17:13ZengIslamic Azad University, Qazvin BranchJournal of Optimization in Industrial Engineering2251-99042423-39352010-01-01Volume 3Issue 5556640A Multi Objective Optimization Approach for Resources Procurement of Bankamir mohammad-zadeh0naser hamidi1mohammad amin nayebi2yusof ebrahimi-sajas3Islamic Azad University,Qazvin Brach, Department of Management & Accounting, Qazvin, IranIslamic Azad University,Qazvin Brach, Department of Management & Accounting, Qazvin, IranIslamic Azad University,Qazvin Brach, Department of Management & Accounting, Qazvin, IranIslamic Azad University,Qazvin Brach, Department of Management & Accounting, Qazvin, IranCalculating total cast of bank resources procurement methods which include current -free loan deposit, saving interest-free loan deposit, regular and net short-term investment deposit, long-term investment deposit and surety bond cash deposit and presenting their optimal integration require precise scientific studies. Hence, this study is an attempt to know which methods are the best optimal integration banking resources. Linear and ideal planning techniques are used to find an optimal solution according to existing mathematical models. We use three algorithms to construct mathematical models. In the suggested mathematical models, linear planning has 6 variables and 2 constraints in getting no information algorithm and 6 variables and 7 constraints in getting information algorithm and the problem is solved by WINQSB software. But, 6 variables and 8 constraints are solved by LINGO8 software. The results of the study show that presenting an optimal integration of resources procurement methods by using mathematical models is possible and is applicable with regard to determining rational and suitable constraints and ideals for all resource procurement methods. In addition, with regard to the calculation and investigation of procurement cost in financial procurement methods, it is found out that total cost (i.e. real operational cost plus nonoperational cost) is the basis of judgment for studying resource procurement cost. Further, as with the total cost of resource procurement methods, current interest-free loan deposit and long-term investment deposit are the most expensive methods while surety bond cash deposit is the cheapest resource procurement method and other methods fall in between.http://www.qjie.ir/article_40_930dac973ec707a479b2589c3aed62a4.pdfgoal programmingcomprehensive criterion techniquelexicography banking deposits (sight, unsight and other deposits)banking resource procurement costbanking resource optimal integration
collection DOAJ
language English
format Article
sources DOAJ
author amir mohammad-zadeh
naser hamidi
mohammad amin nayebi
yusof ebrahimi-sajas
spellingShingle amir mohammad-zadeh
naser hamidi
mohammad amin nayebi
yusof ebrahimi-sajas
A Multi Objective Optimization Approach for Resources Procurement of Bank
Journal of Optimization in Industrial Engineering
goal programming
comprehensive criterion technique
lexicography banking deposits (sight, unsight and other deposits)
banking resource procurement cost
banking resource optimal integration
author_facet amir mohammad-zadeh
naser hamidi
mohammad amin nayebi
yusof ebrahimi-sajas
author_sort amir mohammad-zadeh
title A Multi Objective Optimization Approach for Resources Procurement of Bank
title_short A Multi Objective Optimization Approach for Resources Procurement of Bank
title_full A Multi Objective Optimization Approach for Resources Procurement of Bank
title_fullStr A Multi Objective Optimization Approach for Resources Procurement of Bank
title_full_unstemmed A Multi Objective Optimization Approach for Resources Procurement of Bank
title_sort multi objective optimization approach for resources procurement of bank
publisher Islamic Azad University, Qazvin Branch
series Journal of Optimization in Industrial Engineering
issn 2251-9904
2423-3935
publishDate 2010-01-01
description Calculating total cast of bank resources procurement methods which include current -free loan deposit, saving interest-free loan deposit, regular and net short-term investment deposit, long-term investment deposit and surety bond cash deposit and presenting their optimal integration require precise scientific studies. Hence, this study is an attempt to know which methods are the best optimal integration banking resources. Linear and ideal planning techniques are used to find an optimal solution according to existing mathematical models. We use three algorithms to construct mathematical models. In the suggested mathematical models, linear planning has 6 variables and 2 constraints in getting no information algorithm and 6 variables and 7 constraints in getting information algorithm and the problem is solved by WINQSB software. But, 6 variables and 8 constraints are solved by LINGO8 software. The results of the study show that presenting an optimal integration of resources procurement methods by using mathematical models is possible and is applicable with regard to determining rational and suitable constraints and ideals for all resource procurement methods. In addition, with regard to the calculation and investigation of procurement cost in financial procurement methods, it is found out that total cost (i.e. real operational cost plus nonoperational cost) is the basis of judgment for studying resource procurement cost. Further, as with the total cost of resource procurement methods, current interest-free loan deposit and long-term investment deposit are the most expensive methods while surety bond cash deposit is the cheapest resource procurement method and other methods fall in between.
topic goal programming
comprehensive criterion technique
lexicography banking deposits (sight, unsight and other deposits)
banking resource procurement cost
banking resource optimal integration
url http://www.qjie.ir/article_40_930dac973ec707a479b2589c3aed62a4.pdf
work_keys_str_mv AT amirmohammadzadeh amultiobjectiveoptimizationapproachforresourcesprocurementofbank
AT naserhamidi amultiobjectiveoptimizationapproachforresourcesprocurementofbank
AT mohammadaminnayebi amultiobjectiveoptimizationapproachforresourcesprocurementofbank
AT yusofebrahimisajas amultiobjectiveoptimizationapproachforresourcesprocurementofbank
AT amirmohammadzadeh multiobjectiveoptimizationapproachforresourcesprocurementofbank
AT naserhamidi multiobjectiveoptimizationapproachforresourcesprocurementofbank
AT mohammadaminnayebi multiobjectiveoptimizationapproachforresourcesprocurementofbank
AT yusofebrahimisajas multiobjectiveoptimizationapproachforresourcesprocurementofbank
_version_ 1726013557569486848