Operational Evaluation of Part-Time Shoulder Use for Interstate 476 in the State of Pennsylvania

Part-time shoulder use (PTSU) is a capacity-adding strategy that utilized the shoulder temporarily during the peak commuting period and is used sporadically throughout the United States of America (USA). This strategy aids in addressing a transportation-related issue for major metropolitan areas. Ar...

Full description

Bibliographic Details
Main Authors: Sean Coffey, Seri Park
Format: Article
Language:English
Published: Hindawi Limited 2018-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2018/1724646
id doaj-a8198c7578064347b4889bdfbb8f310f
record_format Article
spelling doaj-a8198c7578064347b4889bdfbb8f310f2020-11-24T20:54:41ZengHindawi LimitedAdvances in Civil Engineering1687-80861687-80942018-01-01201810.1155/2018/17246461724646Operational Evaluation of Part-Time Shoulder Use for Interstate 476 in the State of PennsylvaniaSean Coffey0Seri Park1IH Engineers, 103 College Rd E., Princeton, NJ 08540, USACivil and Environmental Engineering Department, Villanova University, 800 E. Lancaster Avenue, Villanova, PA 19085, USAPart-time shoulder use (PTSU) is a capacity-adding strategy that utilized the shoulder temporarily during the peak commuting period and is used sporadically throughout the United States of America (USA). This strategy aids in addressing a transportation-related issue for major metropolitan areas. Around major metropolitan areas, the land availability is limited due to high population counts, which makes widening roadways for growing populations complex and expensive. Many countries are looking at methods that better utilize the transportation infrastructure currently constructed before widening the roadway. PTSU provides a possible solution to this problem, and this research aims to evaluate the operational benefits of PTSU using a case study based in the state of Pennsylvania. Interstate 476 (I-476), in the Philadelphia, Pennsylvania, metropolitan area is a prime candidate for PTSU. This four-lane highway has peak directional volumes of around 4,700 vehicles per hour in particular sections during the morning commuting period. I-476 is a major commuting route for the region, and the additional capacity during the commuting periods would greatly improve the flow of the surrounding network. This analysis was completed using a Vissim model simulating the 7 AM to 9 AM commuting period. A variety of PTSU scenarios were analyzed including (1) general purpose PTSU lane, (2) passenger cars only PTSU lane, (3) heavy trucks only PTSU lane, and (4) general purpose PTSU lane where additional traffic is induced. Overall, this study determined that PTSU could significantly decrease the travel time on I-476, regardless of vehicle type restrictions, and could provide a more stable traffic density throughout the I-476 network. This research provides additional insight into the effects of vehicle type restrictions on the effectiveness of PTSU and further strengthens the understanding of the operational benefit of PTSU.http://dx.doi.org/10.1155/2018/1724646
collection DOAJ
language English
format Article
sources DOAJ
author Sean Coffey
Seri Park
spellingShingle Sean Coffey
Seri Park
Operational Evaluation of Part-Time Shoulder Use for Interstate 476 in the State of Pennsylvania
Advances in Civil Engineering
author_facet Sean Coffey
Seri Park
author_sort Sean Coffey
title Operational Evaluation of Part-Time Shoulder Use for Interstate 476 in the State of Pennsylvania
title_short Operational Evaluation of Part-Time Shoulder Use for Interstate 476 in the State of Pennsylvania
title_full Operational Evaluation of Part-Time Shoulder Use for Interstate 476 in the State of Pennsylvania
title_fullStr Operational Evaluation of Part-Time Shoulder Use for Interstate 476 in the State of Pennsylvania
title_full_unstemmed Operational Evaluation of Part-Time Shoulder Use for Interstate 476 in the State of Pennsylvania
title_sort operational evaluation of part-time shoulder use for interstate 476 in the state of pennsylvania
publisher Hindawi Limited
series Advances in Civil Engineering
issn 1687-8086
1687-8094
publishDate 2018-01-01
description Part-time shoulder use (PTSU) is a capacity-adding strategy that utilized the shoulder temporarily during the peak commuting period and is used sporadically throughout the United States of America (USA). This strategy aids in addressing a transportation-related issue for major metropolitan areas. Around major metropolitan areas, the land availability is limited due to high population counts, which makes widening roadways for growing populations complex and expensive. Many countries are looking at methods that better utilize the transportation infrastructure currently constructed before widening the roadway. PTSU provides a possible solution to this problem, and this research aims to evaluate the operational benefits of PTSU using a case study based in the state of Pennsylvania. Interstate 476 (I-476), in the Philadelphia, Pennsylvania, metropolitan area is a prime candidate for PTSU. This four-lane highway has peak directional volumes of around 4,700 vehicles per hour in particular sections during the morning commuting period. I-476 is a major commuting route for the region, and the additional capacity during the commuting periods would greatly improve the flow of the surrounding network. This analysis was completed using a Vissim model simulating the 7 AM to 9 AM commuting period. A variety of PTSU scenarios were analyzed including (1) general purpose PTSU lane, (2) passenger cars only PTSU lane, (3) heavy trucks only PTSU lane, and (4) general purpose PTSU lane where additional traffic is induced. Overall, this study determined that PTSU could significantly decrease the travel time on I-476, regardless of vehicle type restrictions, and could provide a more stable traffic density throughout the I-476 network. This research provides additional insight into the effects of vehicle type restrictions on the effectiveness of PTSU and further strengthens the understanding of the operational benefit of PTSU.
url http://dx.doi.org/10.1155/2018/1724646
work_keys_str_mv AT seancoffey operationalevaluationofparttimeshoulderuseforinterstate476inthestateofpennsylvania
AT seripark operationalevaluationofparttimeshoulderuseforinterstate476inthestateofpennsylvania
_version_ 1716793614187626496