Analisis Waktu Pelaksanaan Proyek Konstruksi dengan Variasi Penambahan Jam Kerja
<p>Time and cost greatly affect the success and failure of a project. Measure of the success of a project is usually seen short turnaround time at minimal cost without leaving the quality of result. Systematic project management is required to ensure the project implementation time in accordan...
Main Authors: | Mandiyo Priyo, Sartika Sartika |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Muhammadiyah Yogyakarta
2015-11-01
|
Series: | Semesta Teknika |
Online Access: | https://journal.umy.ac.id/index.php/st/article/view/417 |
Similar Items
-
Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off : Studi Kasus Proyek Pembangunan Prasarana Pengendali Banjir
by: Mandiyo Priyo, et al.
Published: (2016-12-01) -
OPTIMASI WAKTU PROYEK DENGAN PENAMBAHAN JAM KERJA DENGAN PRECEDENCE DIAGRAM METHOD (Studi Kasus Proyek Rumah Susun Sederhana Sewa Pekanbaru)
by: Desi Yasri
Published: (2015-10-01) -
Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi : Studi Kasus Proyek Jalan Bugel-Galur-Poncosari Cs. Tahap I, Provinsi D.I. Yogyakarta
by: Mandiyo Priyo, et al.
Published: (2017-11-01) -
Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi Pembangunan Gedung Olah Raga (Gor)
by: Mandiyo Priyo, et al.
Published: (2018-05-01) -
Aplikasi Value Engineering pada Proyek Konstruksi (Studi Kasus: Proyek Pembangunan Gedung BPKP Yogyakarta)
by: Mandiyo Priyo, et al.
Published: (2016-03-01)