Parallel Robot Scheduling to Minimize Mean Tardiness with Unequal Release Date and Precedence Constraints Using a Hybrid Intelligent System
This paper considers the problem of scheduling a given number of jobs on a specified number of identical parallel robots with unequal release dates and precedence constraints in order to minimize mean tardiness. This problem is strongly NP-hard. The author proposes a hybrid intelligent solution syst...
Main Authors: | Tarık Çakar, Raşit Köker, Yavuz Sarı |
---|---|
Format: | Article |
Language: | English |
Published: |
SAGE Publishing
2012-12-01
|
Series: | International Journal of Advanced Robotic Systems |
Online Access: | https://doi.org/10.5772/54381 |
Similar Items
-
Solving Single Machine Total Weighted Tardiness Problem with Unequal Release Date Using Neurohybrid Particle Swarm Optimization Approach
by: Tarik Cakar, et al.
Published: (2015-01-01) -
Minimizing total tardiness on a machine with unequal release dates
by: Chung-Jung Chen, et al.
Published: (2003) -
A Hybrid Genetic Algorithm to Minimize Total Tardiness for Unrelated Parallel Machine Scheduling with Precedence Constraints
by: Chunfeng Liu
Published: (2013-01-01) -
Heuristics for the single machine weighted quadratic tardiness scheduling problem with unequal release date
by: James Teddy Limousin Sambuchetti
Published: (2019) -
Minimizing the total tardiness on a two-machine flowshop scheduling problem with a precedence constraint
by: 温志皓
Published: (2014)