PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP)

IJD KartikaM agetanis a companyw hich produceo r assemblys hoesth at is activities depend on the demand. This company doesn't have a good schedule in requirement and unschedulemd aterial.T his is becomesb y overloadm ateriacl apacitys o that increaseth e holding cost a.ndr equirementc ost. To s...

Full description

Bibliographic Details
Main Author: Dyah Retno Purwatiningsih
Format: Article
Language:English
Published: Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang 2010-04-01
Series:Jurnal Teknik Industri
Subjects:
Online Access:http://ejournal.umm.ac.id/index.php/industri/article/view/186
id doaj-a642b3736d6f45ccab63095e1684095c
record_format Article
spelling doaj-a642b3736d6f45ccab63095e1684095c2020-11-24T21:13:48ZengJurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah MalangJurnal Teknik Industri 1978-14312527-41122010-04-012211812710.22219/JTIUMM.Vol2.No2.118-127184PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP)Dyah Retno PurwatiningsihIJD KartikaM agetanis a companyw hich produceo r assemblys hoesth at is activities depend on the demand. This company doesn't have a good schedule in requirement and unschedulemd aterial.T his is becomesb y overloadm ateriacl apacitys o that increaseth e holding cost a.ndr equirementc ost. To scheduleth e appropiatem aterial arriving we needt o plan material availabilityw ith Material RequiremenPt lanning( MRP). Firstly implementingt his method forecast he dernandu, singl inier programmingm ethodt o makea gregata nd Masterp roduction Schedule (MPS). We need the data such as demand, product structure, component stock , productionc apacitya, ndp roductionc ost. This methodg et the numbero f regulerw orkeri s about 13 personsH. oldingc ost after implemented MRP is about Rp 4.608.047,48 and before implemented MRp is about Rp 6.455.677,08S. otherei s about P;,pl.847.629o,6t2 9% off afteru singM Rp method..http://ejournal.umm.ac.id/index.php/industri/article/view/186ForecastingMaster Production ScheiluleMaterial Requbement Planning
collection DOAJ
language English
format Article
sources DOAJ
author Dyah Retno Purwatiningsih
spellingShingle Dyah Retno Purwatiningsih
PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP)
Jurnal Teknik Industri
Forecasting
Master Production Scheilule
Material Requbement Planning
author_facet Dyah Retno Purwatiningsih
author_sort Dyah Retno Purwatiningsih
title PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP)
title_short PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP)
title_full PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP)
title_fullStr PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP)
title_full_unstemmed PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP)
title_sort parencanaan kebutuhan bahan baku snpatu dengan metode material requiri,mint planning (mrp)
publisher Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
series Jurnal Teknik Industri
issn 1978-1431
2527-4112
publishDate 2010-04-01
description IJD KartikaM agetanis a companyw hich produceo r assemblys hoesth at is activities depend on the demand. This company doesn't have a good schedule in requirement and unschedulemd aterial.T his is becomesb y overloadm ateriacl apacitys o that increaseth e holding cost a.ndr equirementc ost. To scheduleth e appropiatem aterial arriving we needt o plan material availabilityw ith Material RequiremenPt lanning( MRP). Firstly implementingt his method forecast he dernandu, singl inier programmingm ethodt o makea gregata nd Masterp roduction Schedule (MPS). We need the data such as demand, product structure, component stock , productionc apacitya, ndp roductionc ost. This methodg et the numbero f regulerw orkeri s about 13 personsH. oldingc ost after implemented MRP is about Rp 4.608.047,48 and before implemented MRp is about Rp 6.455.677,08S. otherei s about P;,pl.847.629o,6t2 9% off afteru singM Rp method..
topic Forecasting
Master Production Scheilule
Material Requbement Planning
url http://ejournal.umm.ac.id/index.php/industri/article/view/186
work_keys_str_mv AT dyahretnopurwatiningsih parencanaankebutuhanbahanbakusnpatudenganmetodematerialrequirimintplanningmrp
_version_ 1716748081601445888