PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP)
IJD KartikaM agetanis a companyw hich produceo r assemblys hoesth at is activities depend on the demand. This company doesn't have a good schedule in requirement and unschedulemd aterial.T his is becomesb y overloadm ateriacl apacitys o that increaseth e holding cost a.ndr equirementc ost. To s...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
2010-04-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://ejournal.umm.ac.id/index.php/industri/article/view/186 |
id |
doaj-a642b3736d6f45ccab63095e1684095c |
---|---|
record_format |
Article |
spelling |
doaj-a642b3736d6f45ccab63095e1684095c2020-11-24T21:13:48ZengJurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah MalangJurnal Teknik Industri 1978-14312527-41122010-04-012211812710.22219/JTIUMM.Vol2.No2.118-127184PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP)Dyah Retno PurwatiningsihIJD KartikaM agetanis a companyw hich produceo r assemblys hoesth at is activities depend on the demand. This company doesn't have a good schedule in requirement and unschedulemd aterial.T his is becomesb y overloadm ateriacl apacitys o that increaseth e holding cost a.ndr equirementc ost. To scheduleth e appropiatem aterial arriving we needt o plan material availabilityw ith Material RequiremenPt lanning( MRP). Firstly implementingt his method forecast he dernandu, singl inier programmingm ethodt o makea gregata nd Masterp roduction Schedule (MPS). We need the data such as demand, product structure, component stock , productionc apacitya, ndp roductionc ost. This methodg et the numbero f regulerw orkeri s about 13 personsH. oldingc ost after implemented MRP is about Rp 4.608.047,48 and before implemented MRp is about Rp 6.455.677,08S. otherei s about P;,pl.847.629o,6t2 9% off afteru singM Rp method..http://ejournal.umm.ac.id/index.php/industri/article/view/186ForecastingMaster Production ScheiluleMaterial Requbement Planning |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Dyah Retno Purwatiningsih |
spellingShingle |
Dyah Retno Purwatiningsih PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP) Jurnal Teknik Industri Forecasting Master Production Scheilule Material Requbement Planning |
author_facet |
Dyah Retno Purwatiningsih |
author_sort |
Dyah Retno Purwatiningsih |
title |
PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP) |
title_short |
PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP) |
title_full |
PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP) |
title_fullStr |
PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP) |
title_full_unstemmed |
PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP) |
title_sort |
parencanaan kebutuhan bahan baku snpatu dengan metode material requiri,mint planning (mrp) |
publisher |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang |
series |
Jurnal Teknik Industri |
issn |
1978-1431 2527-4112 |
publishDate |
2010-04-01 |
description |
IJD KartikaM agetanis a companyw hich produceo r assemblys hoesth at is activities
depend on the demand. This company doesn't have a good schedule in requirement and
unschedulemd aterial.T his is becomesb y overloadm ateriacl apacitys o that increaseth e holding
cost a.ndr equirementc ost. To scheduleth e appropiatem aterial arriving we needt o plan material
availabilityw ith Material RequiremenPt lanning( MRP). Firstly implementingt his method
forecast he dernandu, singl inier programmingm ethodt o makea gregata nd Masterp roduction
Schedule (MPS). We need the data such as demand, product structure, component stock ,
productionc apacitya, ndp roductionc ost.
This methodg et the numbero f regulerw orkeri s about 13 personsH. oldingc ost after
implemented MRP is about Rp 4.608.047,48 and before implemented MRp is about
Rp 6.455.677,08S. otherei s about P;,pl.847.629o,6t2 9% off afteru singM Rp method.. |
topic |
Forecasting Master Production Scheilule Material Requbement Planning |
url |
http://ejournal.umm.ac.id/index.php/industri/article/view/186 |
work_keys_str_mv |
AT dyahretnopurwatiningsih parencanaankebutuhanbahanbakusnpatudenganmetodematerialrequirimintplanningmrp |
_version_ |
1716748081601445888 |