Simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealing
One of the classes of the project schedule is the Material Procurement Scheduling (MPS) problem, which is considered besides the material allocation to warehouse (MAW) problem recently. In the literature, the Simultaneous Solution of MPS-MAW is investigated by considering one warehouse and unlimited...
Main Authors: | Nima Moradi, Shahram Shadrokh |
---|---|
Format: | Article |
Language: | English |
Published: |
Ayandegan Institute of Higher Education, Iran
2019-03-01
|
Series: | Journal of Applied Research on Industrial Engineering |
Subjects: | |
Online Access: | http://www.journal-aprie.com/article_84502.html |
Similar Items
-
Sustainable Scheduling of Material Handling Activities in Labor-Intensive Warehouses: A Decision and Control Model
by: Raffaele Carli, et al.
Published: (2020-04-01) -
An Integrated Model of Project Scheduling and Material Ordering: A Hybrid Simulated Annealing and Genetic Algorithm
by: Nima Zoraghi, et al.
Published: (2012-03-01) -
Optimization of Ordering and Allocation Scheme for Distributed Material Warehouse Based on IGA-SA Algorithm
by: Han Jiang, et al.
Published: (2020-10-01) -
Solving a multi-objective manufacturing cell scheduling problem with the consideration of warehouses using a simulated annealing based procedure
by: Adrián A. Toncovich, et al.
Published: (2019-01-01) -
A New Sustainable Warehouse Management Approach for Workforce and Activities Scheduling
by: Vlado Popović, et al.
Published: (2021-02-01)