Simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealing

One of the classes of the project schedule is the Material Procurement Scheduling (MPS) problem, which is considered besides the material allocation to warehouse (MAW) problem recently. In the literature, the Simultaneous Solution of MPS-MAW is investigated by considering one warehouse and unlimited...

Full description

Bibliographic Details
Main Authors: Nima Moradi, Shahram Shadrokh
Format: Article
Language:English
Published: Ayandegan Institute of Higher Education, Iran 2019-03-01
Series:Journal of Applied Research on Industrial Engineering
Subjects:
Online Access:http://www.journal-aprie.com/article_84502.html
id doaj-a631db53dca943cbbc98583c2f57b5eb
record_format Article
spelling doaj-a631db53dca943cbbc98583c2f57b5eb2021-10-02T18:30:42ZengAyandegan Institute of Higher Education, IranJournal of Applied Research on Industrial Engineering2538-51002019-03-016111510.22105/JARIE.2019.170649.1079 Simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealingNima Moradi0Shahram Shadrokh 1Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran.Department of Industrial Engineering, Sharif University of Technology, Tehran ,Iran.One of the classes of the project schedule is the Material Procurement Scheduling (MPS) problem, which is considered besides the material allocation to warehouse (MAW) problem recently. In the literature, the Simultaneous Solution of MPS-MAW is investigated by considering one warehouse and unlimited capacity of the warehouses most of the times. In this paper, we propose the propositional and mathematical model of the simultaneous MPS-MAW with multiple warehouses and the limited capacity at the whole of the horizon planning for each warehouse. The proposed model aims to obtain the best ordering point, selection of the best suppliers, the best activity start, and the fair material distribution to the warehouses as possible by the given objective function. The proposed model is NP-hard, so a metaheuristic namely simulated annealing is proposed to reach the acceptable but not optimal solutions in a short time. Also, to overcome the complexity of the model, the encoding of the decision variables have been done by adding the auxiliary variable. Comparing the solutions of the small problems with the exact methods shows the validation of the proposed SA. Also, the design of experiments shows the significance of the model and each SA parameters. Finally, by the optimum values of the SA parameters, the large problems have been solved at acceptable times.http://www.journal-aprie.com/article_84502.htmlmaterial procurement schedulematerial allocation to warehousesimulated annealingdesign of experiments
collection DOAJ
language English
format Article
sources DOAJ
author Nima Moradi
Shahram Shadrokh
spellingShingle Nima Moradi
Shahram Shadrokh
Simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealing
Journal of Applied Research on Industrial Engineering
material procurement schedule
material allocation to warehouse
simulated annealing
design of experiments
author_facet Nima Moradi
Shahram Shadrokh
author_sort Nima Moradi
title Simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealing
title_short Simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealing
title_full Simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealing
title_fullStr Simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealing
title_full_unstemmed Simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealing
title_sort simultaneous solution of material procurement scheduling and material allocation to warehouse using simulated annealing
publisher Ayandegan Institute of Higher Education, Iran
series Journal of Applied Research on Industrial Engineering
issn 2538-5100
publishDate 2019-03-01
description One of the classes of the project schedule is the Material Procurement Scheduling (MPS) problem, which is considered besides the material allocation to warehouse (MAW) problem recently. In the literature, the Simultaneous Solution of MPS-MAW is investigated by considering one warehouse and unlimited capacity of the warehouses most of the times. In this paper, we propose the propositional and mathematical model of the simultaneous MPS-MAW with multiple warehouses and the limited capacity at the whole of the horizon planning for each warehouse. The proposed model aims to obtain the best ordering point, selection of the best suppliers, the best activity start, and the fair material distribution to the warehouses as possible by the given objective function. The proposed model is NP-hard, so a metaheuristic namely simulated annealing is proposed to reach the acceptable but not optimal solutions in a short time. Also, to overcome the complexity of the model, the encoding of the decision variables have been done by adding the auxiliary variable. Comparing the solutions of the small problems with the exact methods shows the validation of the proposed SA. Also, the design of experiments shows the significance of the model and each SA parameters. Finally, by the optimum values of the SA parameters, the large problems have been solved at acceptable times.
topic material procurement schedule
material allocation to warehouse
simulated annealing
design of experiments
url http://www.journal-aprie.com/article_84502.html
work_keys_str_mv AT nimamoradi simultaneoussolutionofmaterialprocurementschedulingandmaterialallocationtowarehouseusingsimulatedannealing
AT shahramshadrokh simultaneoussolutionofmaterialprocurementschedulingandmaterialallocationtowarehouseusingsimulatedannealing
_version_ 1716848967634911232