Research on Interruptible Load participating in electricity and reserve joint market
There is a shortage of power supply in multi provincial power grid during peak load period. The response speed of interruptible load is fast, and it has the same excellent regulation performance as the standby on the generation side, which can meet the needs of fast transfer. Aiming at the situation...
Main Authors: | Huang Haiyu, Wang Chunming, Xia Shaolian, Xiong Huaqiang, Jiang Baofeng, Liu Dunnan, Yuan Gao |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/33/e3sconf_aesee2021_01045.pdf |
Similar Items
-
Research on joint optimal scheduling of air conditioning load and electric vehicle under demand response
by: Huang Haiyu, et al.
Published: (2021-01-01) -
Research on Virtual Power Plant Optimal Scheduling Based on TOU Electricity Price
by: Liu Dunnan, et al.
Published: (2021-01-01) -
Determining the Interruptible Load with Strategic Behavior in a Competitive Electricity Market
by: Tae Hyun Yoo, et al.
Published: (2014-12-01) -
Reliability-Constrained Unit Commitment Considering Interruptible Load Participation
by: F. Aminifar, et al.
Published: (2007-01-01) -
Participation of distributed loads in power markets that co-optimize energy and reserves
by: Bilgin, Enes
Published: (2015)