Research on Interruptible Load participating in electricity and reserve joint market
There is a shortage of power supply in multi provincial power grid during peak load period. The response speed of interruptible load is fast, and it has the same excellent regulation performance as the standby on the generation side, which can meet the needs of fast transfer. Aiming at the situation...
Main Authors: | , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/33/e3sconf_aesee2021_01045.pdf |
id |
doaj-a4e583b3133c425695b99ef2ed276069 |
---|---|
record_format |
Article |
spelling |
doaj-a4e583b3133c425695b99ef2ed2760692021-05-28T12:41:59ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012570104510.1051/e3sconf/202125701045e3sconf_aesee2021_01045Research on Interruptible Load participating in electricity and reserve joint marketHuang Haiyu0Wang Chunming1Xia Shaolian2Xiong Huaqiang3Jiang Baofeng4Liu Dunnan5Yuan Gao6Central China Electric Power Dispatching and Control Sub-center of State GridCentral China Electric Power Dispatching and Control Sub-center of State GridCentral China Electric Power Dispatching and Control Sub-center of State GridCentral China Electric Power Dispatching and Control Sub-center of State GridCentral China Electric Power Dispatching and Control Sub-center of State GridState Key Laboratory of Alternate Electrical Power System With Renewable Energy Sources(North China Electric Power University), Changping DistrictState Key Laboratory of Alternate Electrical Power System With Renewable Energy Sources(North China Electric Power University), Changping DistrictThere is a shortage of power supply in multi provincial power grid during peak load period. The response speed of interruptible load is fast, and it has the same excellent regulation performance as the standby on the generation side, which can meet the needs of fast transfer. Aiming at the situation of interruptible load participating in the joint market under the bilateral mode, this paper designs the joint clearing process of electric energy and reserve market considering interruptible load, and establishes the joint clearing model considering interruptible load participating in electric energy and reserve market with the goal of maximizing social welfare. Simulation results verify the effectiveness of the proposed model.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/33/e3sconf_aesee2021_01045.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Huang Haiyu Wang Chunming Xia Shaolian Xiong Huaqiang Jiang Baofeng Liu Dunnan Yuan Gao |
spellingShingle |
Huang Haiyu Wang Chunming Xia Shaolian Xiong Huaqiang Jiang Baofeng Liu Dunnan Yuan Gao Research on Interruptible Load participating in electricity and reserve joint market E3S Web of Conferences |
author_facet |
Huang Haiyu Wang Chunming Xia Shaolian Xiong Huaqiang Jiang Baofeng Liu Dunnan Yuan Gao |
author_sort |
Huang Haiyu |
title |
Research on Interruptible Load participating in electricity and reserve joint market |
title_short |
Research on Interruptible Load participating in electricity and reserve joint market |
title_full |
Research on Interruptible Load participating in electricity and reserve joint market |
title_fullStr |
Research on Interruptible Load participating in electricity and reserve joint market |
title_full_unstemmed |
Research on Interruptible Load participating in electricity and reserve joint market |
title_sort |
research on interruptible load participating in electricity and reserve joint market |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2021-01-01 |
description |
There is a shortage of power supply in multi provincial power grid during peak load period. The response speed of interruptible load is fast, and it has the same excellent regulation performance as the standby on the generation side, which can meet the needs of fast transfer. Aiming at the situation of interruptible load participating in the joint market under the bilateral mode, this paper designs the joint clearing process of electric energy and reserve market considering interruptible load, and establishes the joint clearing model considering interruptible load participating in electric energy and reserve market with the goal of maximizing social welfare. Simulation results verify the effectiveness of the proposed model. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/33/e3sconf_aesee2021_01045.pdf |
work_keys_str_mv |
AT huanghaiyu researchoninterruptibleloadparticipatinginelectricityandreservejointmarket AT wangchunming researchoninterruptibleloadparticipatinginelectricityandreservejointmarket AT xiashaolian researchoninterruptibleloadparticipatinginelectricityandreservejointmarket AT xionghuaqiang researchoninterruptibleloadparticipatinginelectricityandreservejointmarket AT jiangbaofeng researchoninterruptibleloadparticipatinginelectricityandreservejointmarket AT liudunnan researchoninterruptibleloadparticipatinginelectricityandreservejointmarket AT yuangao researchoninterruptibleloadparticipatinginelectricityandreservejointmarket |
_version_ |
1721423923571064832 |