Research on Interruptible Load participating in electricity and reserve joint market

There is a shortage of power supply in multi provincial power grid during peak load period. The response speed of interruptible load is fast, and it has the same excellent regulation performance as the standby on the generation side, which can meet the needs of fast transfer. Aiming at the situation...

Full description

Bibliographic Details
Main Authors: Huang Haiyu, Wang Chunming, Xia Shaolian, Xiong Huaqiang, Jiang Baofeng, Liu Dunnan, Yuan Gao
Format: Article
Language:English
Published: EDP Sciences 2021-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/33/e3sconf_aesee2021_01045.pdf
Description
Summary:There is a shortage of power supply in multi provincial power grid during peak load period. The response speed of interruptible load is fast, and it has the same excellent regulation performance as the standby on the generation side, which can meet the needs of fast transfer. Aiming at the situation of interruptible load participating in the joint market under the bilateral mode, this paper designs the joint clearing process of electric energy and reserve market considering interruptible load, and establishes the joint clearing model considering interruptible load participating in electric energy and reserve market with the goal of maximizing social welfare. Simulation results verify the effectiveness of the proposed model.
ISSN:2267-1242