CHANGE IN THE LABOR COSTSAT INTEGRATION OF SPECIAL DESIGN NPP
The question of changes in labor costs for consolidation of special armometal construction accident. An example is given for assessing the reduction of terms of raising the selected part of the reactor compartment.
Main Authors: | Pergamenshchik Boris Klimentjevich, Temishev Ruslan Ramzanovich |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
2012-09-01
|
Series: | Vestnik MGSU |
Subjects: | |
Online Access: | http://vestnikmgsu.ru/files/archive/issues/2012/1/ru/26.pdf |
Similar Items
-
An improved time-cost trade-off model with optimal labor productivity
by: Chien-Liang Lin, et al.
Published: (2020-02-01) -
Estimation of the Efficiency of Working Time Usage as a Factor of Sustainable Increase of Labor Productivity
by: Bogatyreva I.V., et al.
Published: (2019-01-01) -
Rapid Cycle Implementation and Retrospective Evaluation of a SARS-CoV-2 Checklist in Labor and Delivery
by: Liana Zucco, et al.
Published: (2021-08-01) -
HE CONVERSION OF THE EFFICIENCY OF LABOR, RESPECTIVELY OF LABOR PRODUCTIVITY IN THE ECONOMIC AND COMMERCIAL RATE OF RETURN
by: Constantin CĂRUNTU, et al.
Published: (2010-12-01) -
Consolidation in the Henry County Public School System
by: Witt, Kathy
Published: (2014)