ANALYSIS OF THE IMPACT OF IMPROVING COAL PRODUCTION ON ECONOMIC STRUCTURE OF KABUPATEN MUARA ENIM, SOUTH SUMATERA

Starting in 2022, the State-owned coal company in South Sumatera plans to produce coal 5.72 million tonnes per year. 3.43 million tons of which will be processed to produce 450,000 tons of polypropylene, 1.47 million tons to produce 400,000 tons of dymethyl ether, and 811,885 tons to produce 570,000...

Full description

Bibliographic Details
Main Author: triswan suseno
Format: Article
Language:Indonesian
Published: Universitas Islam Bandung 2019-06-01
Series:Statistika
Subjects:
Online Access:https://ejournal.unisba.ac.id/index.php/statistika/article/view/4531
id doaj-a33cd882bda14c389f0b6fc6cb5219d0
record_format Article
spelling doaj-a33cd882bda14c389f0b6fc6cb5219d02020-11-25T02:04:07ZindUniversitas Islam BandungStatistika1411-58912019-06-0119111710.29313/jstat.v19i1.45312772ANALYSIS OF THE IMPACT OF IMPROVING COAL PRODUCTION ON ECONOMIC STRUCTURE OF KABUPATEN MUARA ENIM, SOUTH SUMATERAtriswan suseno0R & D coal mining technologyStarting in 2022, the State-owned coal company in South Sumatera plans to produce coal 5.72 million tonnes per year. 3.43 million tons of which will be processed to produce 450,000 tons of polypropylene, 1.47 million tons to produce 400,000 tons of dymethyl ether, and 811,885 tons to produce 570,000 tons of urea fertilizer. The amount of coal to steam power plant needs as much as 3.45 million tons, bringing the total addition of coal production per year as much as 9.17 million tons. The coal downstreaming sector will able to absorb labour of 1,604 people, the size of the value of money which will be obtained by these workers is estimated at USD 26,459,273, an the company's profit from the results of the processing of the coal downstreaming of USD 298,476,000. The existence of the industry turned out taxes, generating government revenue to USD 110.819.765. Using input output method, the increase in coal production amounted to 9.1 million tonnes or IDR 3.44 trillion worth encourages other sectors to improve the output of Rp. 3.62 trillion. The impact of investment for processing coal in Muara Enim in 2022 results on increasing of MuaraEnim GDP to IDR 114,38 trillion and creating jobs for the various sectors as much as 5,578 people. Keywords: GDP, coal, downstream, input, output.https://ejournal.unisba.ac.id/index.php/statistika/article/view/4531GDP, coal, downstream, input, output.
collection DOAJ
language Indonesian
format Article
sources DOAJ
author triswan suseno
spellingShingle triswan suseno
ANALYSIS OF THE IMPACT OF IMPROVING COAL PRODUCTION ON ECONOMIC STRUCTURE OF KABUPATEN MUARA ENIM, SOUTH SUMATERA
Statistika
GDP, coal, downstream, input, output.
author_facet triswan suseno
author_sort triswan suseno
title ANALYSIS OF THE IMPACT OF IMPROVING COAL PRODUCTION ON ECONOMIC STRUCTURE OF KABUPATEN MUARA ENIM, SOUTH SUMATERA
title_short ANALYSIS OF THE IMPACT OF IMPROVING COAL PRODUCTION ON ECONOMIC STRUCTURE OF KABUPATEN MUARA ENIM, SOUTH SUMATERA
title_full ANALYSIS OF THE IMPACT OF IMPROVING COAL PRODUCTION ON ECONOMIC STRUCTURE OF KABUPATEN MUARA ENIM, SOUTH SUMATERA
title_fullStr ANALYSIS OF THE IMPACT OF IMPROVING COAL PRODUCTION ON ECONOMIC STRUCTURE OF KABUPATEN MUARA ENIM, SOUTH SUMATERA
title_full_unstemmed ANALYSIS OF THE IMPACT OF IMPROVING COAL PRODUCTION ON ECONOMIC STRUCTURE OF KABUPATEN MUARA ENIM, SOUTH SUMATERA
title_sort analysis of the impact of improving coal production on economic structure of kabupaten muara enim, south sumatera
publisher Universitas Islam Bandung
series Statistika
issn 1411-5891
publishDate 2019-06-01
description Starting in 2022, the State-owned coal company in South Sumatera plans to produce coal 5.72 million tonnes per year. 3.43 million tons of which will be processed to produce 450,000 tons of polypropylene, 1.47 million tons to produce 400,000 tons of dymethyl ether, and 811,885 tons to produce 570,000 tons of urea fertilizer. The amount of coal to steam power plant needs as much as 3.45 million tons, bringing the total addition of coal production per year as much as 9.17 million tons. The coal downstreaming sector will able to absorb labour of 1,604 people, the size of the value of money which will be obtained by these workers is estimated at USD 26,459,273, an the company's profit from the results of the processing of the coal downstreaming of USD 298,476,000. The existence of the industry turned out taxes, generating government revenue to USD 110.819.765. Using input output method, the increase in coal production amounted to 9.1 million tonnes or IDR 3.44 trillion worth encourages other sectors to improve the output of Rp. 3.62 trillion. The impact of investment for processing coal in Muara Enim in 2022 results on increasing of MuaraEnim GDP to IDR 114,38 trillion and creating jobs for the various sectors as much as 5,578 people. Keywords: GDP, coal, downstream, input, output.
topic GDP, coal, downstream, input, output.
url https://ejournal.unisba.ac.id/index.php/statistika/article/view/4531
work_keys_str_mv AT triswansuseno analysisoftheimpactofimprovingcoalproductiononeconomicstructureofkabupatenmuaraenimsouthsumatera
_version_ 1724944558796570624