Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm
In view of the poor performance of the original mathematical model of assembly construction project precost budget, a mathematical model of assembly construction project precost budget based on improved neural network algorithm is proposed. This paper investigates the cost content of assembly constr...
Main Authors: | Xin Lin, Yinan Lu |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2020-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/3674929 |
Similar Items
-
Safety budgeting cost for construction project
by: Abd. Latib, Firdaus
Published: (2014) -
Construction project budgeting including time buffers and costs
by: Mieczysław Połoński
Published: (2014-12-01) -
Applying BIM to Estimate Construction Costs in Project Early Stages
by: Ho, Meng-Cheng, et al.
Published: (2015) -
PROJECT COST MANAGEMENT AT THE DESIGN AND CONSTRUCTION STAGE
by: M. A. Fedotova, et al.
Published: (2015-04-01) -
Improvement of the cost-benefit analysis algorithm for high-rise construction projects
by: Gafurov Andrey, et al.
Published: (2018-01-01)