Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm
In view of the poor performance of the original mathematical model of assembly construction project precost budget, a mathematical model of assembly construction project precost budget based on improved neural network algorithm is proposed. This paper investigates the cost content of assembly constr...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2020-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/3674929 |
id |
doaj-a29ee9b196234c20aa7c7f2e0eb3f605 |
---|---|
record_format |
Article |
spelling |
doaj-a29ee9b196234c20aa7c7f2e0eb3f6052020-11-25T02:56:52ZengHindawi LimitedMathematical Problems in Engineering1024-123X1563-51472020-01-01202010.1155/2020/36749293674929Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network AlgorithmXin Lin0Yinan Lu1School of Urban Construction Engineering, Chongqing Radio & TV University, Chongqing, ChinaSchool of Information Engineering, Nanchang University, Nanchang, ChinaIn view of the poor performance of the original mathematical model of assembly construction project precost budget, a mathematical model of assembly construction project precost budget based on improved neural network algorithm is proposed. This paper investigates the cost content of assembly construction project and analyzes its early cost. It finds that the early cost of assembly construction project includes component production cost, transportation component cost, and installation component cost. Based on the improved neural network algorithm to build an improved neural network model, the improved neural network model to mine the cost data in the early stage of assembly construction project is used. In this paper, the earned value variable is introduced to transform the project duration and project cost in the early stage of the prefabricated construction project into quantifiable cost data, and the earned value analysis method is used to estimate the implementation cost of the prefabricated construction project. According to the result of cost estimation, the mathematical model of precost budget of prefabricated construction project is built based on the project parameters. In order to prove that the cost budget performance of the mathematical model based on the improved neural network algorithm in the early stage of assembly construction project is better, the original mathematical model is compared with the mathematical model, the experimental results show that the cost budget performance of the model is better than the original model, and the cost budget performance is improved.http://dx.doi.org/10.1155/2020/3674929 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Xin Lin Yinan Lu |
spellingShingle |
Xin Lin Yinan Lu Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm Mathematical Problems in Engineering |
author_facet |
Xin Lin Yinan Lu |
author_sort |
Xin Lin |
title |
Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm |
title_short |
Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm |
title_full |
Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm |
title_fullStr |
Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm |
title_full_unstemmed |
Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm |
title_sort |
research on mathematical model of cost budget in the early stage of assembly construction project based on improved neural network algorithm |
publisher |
Hindawi Limited |
series |
Mathematical Problems in Engineering |
issn |
1024-123X 1563-5147 |
publishDate |
2020-01-01 |
description |
In view of the poor performance of the original mathematical model of assembly construction project precost budget, a mathematical model of assembly construction project precost budget based on improved neural network algorithm is proposed. This paper investigates the cost content of assembly construction project and analyzes its early cost. It finds that the early cost of assembly construction project includes component production cost, transportation component cost, and installation component cost. Based on the improved neural network algorithm to build an improved neural network model, the improved neural network model to mine the cost data in the early stage of assembly construction project is used. In this paper, the earned value variable is introduced to transform the project duration and project cost in the early stage of the prefabricated construction project into quantifiable cost data, and the earned value analysis method is used to estimate the implementation cost of the prefabricated construction project. According to the result of cost estimation, the mathematical model of precost budget of prefabricated construction project is built based on the project parameters. In order to prove that the cost budget performance of the mathematical model based on the improved neural network algorithm in the early stage of assembly construction project is better, the original mathematical model is compared with the mathematical model, the experimental results show that the cost budget performance of the model is better than the original model, and the cost budget performance is improved. |
url |
http://dx.doi.org/10.1155/2020/3674929 |
work_keys_str_mv |
AT xinlin researchonmathematicalmodelofcostbudgetintheearlystageofassemblyconstructionprojectbasedonimprovedneuralnetworkalgorithm AT yinanlu researchonmathematicalmodelofcostbudgetintheearlystageofassemblyconstructionprojectbasedonimprovedneuralnetworkalgorithm |
_version_ |
1715344868349313024 |