The study of intelligent scheduling algorithm oriented to complex constraints and multi-process roller grinding workshop

Roller grinding workshop is a typical multi-unit and multi-task manufacturing scenario, which is aimed to repair the surface damage of the rollers caused by the rolling process, so that the rollers can be reused. Due to the process complexity of roller grinding workshop and the large volume and weig...

Full description

Bibliographic Details
Main Authors: Hanyang Li, Chao Wang, Sheng Jiang, Sheng Liu, Yiming Rong, Xuekun Li
Format: Article
Language:English
Published: SAGE Publishing 2020-11-01
Series:Advances in Mechanical Engineering
Online Access:https://doi.org/10.1177/1687814020975884
id doaj-a1c7b678d2dd42da85b12cf19c5083fa
record_format Article
spelling doaj-a1c7b678d2dd42da85b12cf19c5083fa2020-11-30T21:03:23ZengSAGE PublishingAdvances in Mechanical Engineering1687-81402020-11-011210.1177/1687814020975884The study of intelligent scheduling algorithm oriented to complex constraints and multi-process roller grinding workshopHanyang Li0Chao Wang1Sheng Jiang2Sheng Liu3Yiming Rong4Xuekun Li5Hiecise Innovative Material Science and Technology Co., Ltd, Jiangsu, ChinaDepartment of Mechanical Engineering, Tsinghua University, Beijing, ChinaHiecise Innovative Material Science and Technology Co., Ltd, Jiangsu, ChinaSchool of Power and Mechanical Engineering, Wuhan University, Wuhan, ChinaDepartment of Mechanical and Energy Engineering, Southern University of Science and Technology, Shenzhen, ChinaDepartment of Mechanical Engineering, Tsinghua University, Beijing, ChinaRoller grinding workshop is a typical multi-unit and multi-task manufacturing scenario, which is aimed to repair the surface damage of the rollers caused by the rolling process, so that the rollers can be reused. Due to the process complexity of roller grinding workshop and the large volume and weight of the roller, hoisting and transportation mode with multiple cranes is required. Consequently, the scheduling of the roller grinding workshop needs to consider both the task sequencing in time and the noninterference of the multi-crane trajectory in space. In this paper, the intelligent scheduling of roller grinding workshop is studied based on the characteristics of complex tasks and space-time coupling constraints. Firstly, the scheduling basis is established based on priority rules and process constraints. In order to solve the scheduling problem under the space-time coupling constraints, the position coordinate system is established, and then the algorithms of crane position tracking and cooperative motion without interference are developed. Further, considering the transportation time of crane and its out of sync time point with the processes, the intelligent decision and scheduling algorithm are developed based on the dynamic priority strategy defined to realize scheduling, including time decision, crane decision, and process decision. With the developed intelligent scheduling algorithm applied, the simulation of the roller grinding workshop is conducted under three combinations of priority strategy and noninterference strategy to verify algorithm performance. Under the guarantee of crane noninterference during the full production, the efficiency is improved by 22.1% compared with the existing processing mode of industry. Additionally, EPTR (effective process time rate) based on dynamic priority strategy and noninterference strategy B is up to 100% to avoid intervals between two processes in the scheduling. The dynamic priority developed in this paper reveals more efficiency than MOR principle, while with the strategy B the CUR (crane utilization rate) can be improved more than 20% under the condition of enough machines which facilitates to obtain shorter makespan than strategy A. The intelligent scheduling algorithm developed guarantees the effectiveness and rationality of scheduling with multi-unit and multi-task under the complex constraints. Finally, in order to realize the automatic and intelligent operation of the roller grinding workshop, the management software of the roller grinding workshop is developed by integrating the intelligent scheduling algorithm, which realizes the intelligent production, monitoring, and management of the roller grinding workshop during the full production cycle.https://doi.org/10.1177/1687814020975884
collection DOAJ
language English
format Article
sources DOAJ
author Hanyang Li
Chao Wang
Sheng Jiang
Sheng Liu
Yiming Rong
Xuekun Li
spellingShingle Hanyang Li
Chao Wang
Sheng Jiang
Sheng Liu
Yiming Rong
Xuekun Li
The study of intelligent scheduling algorithm oriented to complex constraints and multi-process roller grinding workshop
Advances in Mechanical Engineering
author_facet Hanyang Li
Chao Wang
Sheng Jiang
Sheng Liu
Yiming Rong
Xuekun Li
author_sort Hanyang Li
title The study of intelligent scheduling algorithm oriented to complex constraints and multi-process roller grinding workshop
title_short The study of intelligent scheduling algorithm oriented to complex constraints and multi-process roller grinding workshop
title_full The study of intelligent scheduling algorithm oriented to complex constraints and multi-process roller grinding workshop
title_fullStr The study of intelligent scheduling algorithm oriented to complex constraints and multi-process roller grinding workshop
title_full_unstemmed The study of intelligent scheduling algorithm oriented to complex constraints and multi-process roller grinding workshop
title_sort study of intelligent scheduling algorithm oriented to complex constraints and multi-process roller grinding workshop
publisher SAGE Publishing
series Advances in Mechanical Engineering
issn 1687-8140
publishDate 2020-11-01
description Roller grinding workshop is a typical multi-unit and multi-task manufacturing scenario, which is aimed to repair the surface damage of the rollers caused by the rolling process, so that the rollers can be reused. Due to the process complexity of roller grinding workshop and the large volume and weight of the roller, hoisting and transportation mode with multiple cranes is required. Consequently, the scheduling of the roller grinding workshop needs to consider both the task sequencing in time and the noninterference of the multi-crane trajectory in space. In this paper, the intelligent scheduling of roller grinding workshop is studied based on the characteristics of complex tasks and space-time coupling constraints. Firstly, the scheduling basis is established based on priority rules and process constraints. In order to solve the scheduling problem under the space-time coupling constraints, the position coordinate system is established, and then the algorithms of crane position tracking and cooperative motion without interference are developed. Further, considering the transportation time of crane and its out of sync time point with the processes, the intelligent decision and scheduling algorithm are developed based on the dynamic priority strategy defined to realize scheduling, including time decision, crane decision, and process decision. With the developed intelligent scheduling algorithm applied, the simulation of the roller grinding workshop is conducted under three combinations of priority strategy and noninterference strategy to verify algorithm performance. Under the guarantee of crane noninterference during the full production, the efficiency is improved by 22.1% compared with the existing processing mode of industry. Additionally, EPTR (effective process time rate) based on dynamic priority strategy and noninterference strategy B is up to 100% to avoid intervals between two processes in the scheduling. The dynamic priority developed in this paper reveals more efficiency than MOR principle, while with the strategy B the CUR (crane utilization rate) can be improved more than 20% under the condition of enough machines which facilitates to obtain shorter makespan than strategy A. The intelligent scheduling algorithm developed guarantees the effectiveness and rationality of scheduling with multi-unit and multi-task under the complex constraints. Finally, in order to realize the automatic and intelligent operation of the roller grinding workshop, the management software of the roller grinding workshop is developed by integrating the intelligent scheduling algorithm, which realizes the intelligent production, monitoring, and management of the roller grinding workshop during the full production cycle.
url https://doi.org/10.1177/1687814020975884
work_keys_str_mv AT hanyangli thestudyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
AT chaowang thestudyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
AT shengjiang thestudyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
AT shengliu thestudyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
AT yimingrong thestudyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
AT xuekunli thestudyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
AT hanyangli studyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
AT chaowang studyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
AT shengjiang studyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
AT shengliu studyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
AT yimingrong studyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
AT xuekunli studyofintelligentschedulingalgorithmorientedtocomplexconstraintsandmultiprocessrollergrindingworkshop
_version_ 1724411440925769728