Analysis of a redundant system with priority and Weibull distribution for failure and repair
The main objective of the present study is to analyse a redundant system under the concept of priority and Weibull distribution for all random variables with different scale parameter and common shape parameter. For this purpose, by using semi-Markovian approach and regenerative point technique a re...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2016-12-01
|
Series: | Cogent Mathematics |
Subjects: | |
Online Access: | http://dx.doi.org/10.1080/23311835.2015.1135721 |
id |
doaj-a10cc1d4202c4760867e196ab81930f9 |
---|---|
record_format |
Article |
spelling |
doaj-a10cc1d4202c4760867e196ab81930f92020-11-25T01:30:55ZengTaylor & Francis GroupCogent Mathematics2331-18352016-12-013110.1080/23311835.2015.11357211135721Analysis of a redundant system with priority and Weibull distribution for failure and repairAshish Kumar0Monika Saini1Kuntal Devi2Manipal University JaipurManipal University JaipurManipal University JaipurThe main objective of the present study is to analyse a redundant system under the concept of priority and Weibull distribution for all random variables with different scale parameter and common shape parameter. For this purpose, by using semi-Markovian approach and regenerative point technique a reliability model is developed for a two non-identical unit system. A single repair facility is provided to the system to perform all repair activities. After a pre-specified time to enhance the performance and efficiency of the system the unit goes for preventive maintenance (PM). Priority to the repair of original unit is given over the PM of duplicate unit. Numerical results for the mean time of system failure, availability and profit function have been derived for a particular case to highlight the importance of the study.http://dx.doi.org/10.1080/23311835.2015.1135721redundant systemnon-identical unitsWeibull failure and repair lawsprioritypreventive maintenance and maximum operation time |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Ashish Kumar Monika Saini Kuntal Devi |
spellingShingle |
Ashish Kumar Monika Saini Kuntal Devi Analysis of a redundant system with priority and Weibull distribution for failure and repair Cogent Mathematics redundant system non-identical units Weibull failure and repair laws priority preventive maintenance and maximum operation time |
author_facet |
Ashish Kumar Monika Saini Kuntal Devi |
author_sort |
Ashish Kumar |
title |
Analysis of a redundant system with priority and Weibull distribution for failure and repair |
title_short |
Analysis of a redundant system with priority and Weibull distribution for failure and repair |
title_full |
Analysis of a redundant system with priority and Weibull distribution for failure and repair |
title_fullStr |
Analysis of a redundant system with priority and Weibull distribution for failure and repair |
title_full_unstemmed |
Analysis of a redundant system with priority and Weibull distribution for failure and repair |
title_sort |
analysis of a redundant system with priority and weibull distribution for failure and repair |
publisher |
Taylor & Francis Group |
series |
Cogent Mathematics |
issn |
2331-1835 |
publishDate |
2016-12-01 |
description |
The main objective of the present study is to analyse a redundant system under the concept of priority and Weibull distribution for all random variables with different scale parameter and common shape parameter. For this purpose, by using semi-Markovian approach and regenerative point technique a reliability model is developed for a two non-identical unit system. A single repair facility is provided to the system to perform all repair activities. After a pre-specified time to enhance the performance and efficiency of the system the unit goes for preventive maintenance (PM). Priority to the repair of original unit is given over the PM of duplicate unit. Numerical results for the mean time of system failure, availability and profit function have been derived for a particular case to highlight the importance of the study. |
topic |
redundant system non-identical units Weibull failure and repair laws priority preventive maintenance and maximum operation time |
url |
http://dx.doi.org/10.1080/23311835.2015.1135721 |
work_keys_str_mv |
AT ashishkumar analysisofaredundantsystemwithpriorityandweibulldistributionforfailureandrepair AT monikasaini analysisofaredundantsystemwithpriorityandweibulldistributionforfailureandrepair AT kuntaldevi analysisofaredundantsystemwithpriorityandweibulldistributionforfailureandrepair |
_version_ |
1725088997361844224 |