Integrating the sequence dependent setup time open shop problem and preventive maintenance policies
In most industrial environments, it is usually considered that machines are accessible throughout the planning horizon, but in real situation, machines may be unavailable due to a scheduled preventive maintenance where the periods of unavailability are known in advance. The main idea of this paper...
Main Authors: | K. Naboureh, E. Safari |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2016-09-01
|
Series: | Decision Science Letters |
Subjects: | |
Online Access: | http://www.growingscience.com/dsl/Vol5/dsl_2016_12.pdf |
Similar Items
-
A Heuristic Rule Based on Complex Network for Open Shop Scheduling Problem With Sequence-Dependent Setup Times and Delivery Times
by: Zilong Zhuang, et al.
Published: (2019-01-01) -
Partial flexible job shop scheduling considering preventive maintenance and priorities
by: Ameneh Farahani, et al.
Published: (2020-12-01) -
COMPARISON BETWEEN MIXED INTEGER PROGRAMMING WITH HEURISTIC METHOD FOR JOB SHOP SCHEDULING WITH SEPARABLE SEQUENCE-DEPENDENT SETUPS
by: I Gede Agus Widyadana
Published: (2001-01-01) -
Dataset of metaheuristics for the flow shop scheduling problem with maintenance activities integrated
by: Antonella Branda, et al.
Published: (2021-06-01) -
Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities
by: Seyyed Mohammad Hassan Hosseini
Published: (2016-05-01)