Integrating the sequence dependent setup time open shop problem and preventive maintenance policies

In most industrial environments, it is usually considered that machines are accessible throughout the planning horizon, but in real situation, machines may be unavailable due to a scheduled preventive maintenance where the periods of unavailability are known in advance. The main idea of this paper...

Full description

Bibliographic Details
Main Authors: K. Naboureh, E. Safari
Format: Article
Language:English
Published: Growing Science 2016-09-01
Series:Decision Science Letters
Subjects:
Online Access:http://www.growingscience.com/dsl/Vol5/dsl_2016_12.pdf
id doaj-a0565f4dde134251954205f97b124b2b
record_format Article
spelling doaj-a0565f4dde134251954205f97b124b2b2020-11-24T23:08:24ZengGrowing ScienceDecision Science Letters1929-58041929-58122016-09-015453555010.5267/j.dsl.2016.4.002Integrating the sequence dependent setup time open shop problem and preventive maintenance policiesK. NabourehE. Safari In most industrial environments, it is usually considered that machines are accessible throughout the planning horizon, but in real situation, machines may be unavailable due to a scheduled preventive maintenance where the periods of unavailability are known in advance. The main idea of this paper is to consider different preventive maintenance policies on machines regarding open shop scheduling problem (OSSP) with sequence dependent setup times (SDST) using immune algorithm. The preventive maintenance (PM) policies are planned for maximizing availability of machines or keeping minimum level of reliability through the production horizon. The objective function of the paper is to minimize makespan. In total, the proposed algorithm extensively is compared with six adaptations of existing heuristic and meta-heuristic methods for the problem through data sets from benchmarks based on Taillard’s instances with some adjustments. The results show that the proposed algorithm outperforms other algorithms for this problem.http://www.growingscience.com/dsl/Vol5/dsl_2016_12.pdfOpen shopMeta heuristicsPreventive maintenanceSDSTImmune Algorithm
collection DOAJ
language English
format Article
sources DOAJ
author K. Naboureh
E. Safari
spellingShingle K. Naboureh
E. Safari
Integrating the sequence dependent setup time open shop problem and preventive maintenance policies
Decision Science Letters
Open shop
Meta heuristics
Preventive maintenance
SDST
Immune Algorithm
author_facet K. Naboureh
E. Safari
author_sort K. Naboureh
title Integrating the sequence dependent setup time open shop problem and preventive maintenance policies
title_short Integrating the sequence dependent setup time open shop problem and preventive maintenance policies
title_full Integrating the sequence dependent setup time open shop problem and preventive maintenance policies
title_fullStr Integrating the sequence dependent setup time open shop problem and preventive maintenance policies
title_full_unstemmed Integrating the sequence dependent setup time open shop problem and preventive maintenance policies
title_sort integrating the sequence dependent setup time open shop problem and preventive maintenance policies
publisher Growing Science
series Decision Science Letters
issn 1929-5804
1929-5812
publishDate 2016-09-01
description In most industrial environments, it is usually considered that machines are accessible throughout the planning horizon, but in real situation, machines may be unavailable due to a scheduled preventive maintenance where the periods of unavailability are known in advance. The main idea of this paper is to consider different preventive maintenance policies on machines regarding open shop scheduling problem (OSSP) with sequence dependent setup times (SDST) using immune algorithm. The preventive maintenance (PM) policies are planned for maximizing availability of machines or keeping minimum level of reliability through the production horizon. The objective function of the paper is to minimize makespan. In total, the proposed algorithm extensively is compared with six adaptations of existing heuristic and meta-heuristic methods for the problem through data sets from benchmarks based on Taillard’s instances with some adjustments. The results show that the proposed algorithm outperforms other algorithms for this problem.
topic Open shop
Meta heuristics
Preventive maintenance
SDST
Immune Algorithm
url http://www.growingscience.com/dsl/Vol5/dsl_2016_12.pdf
work_keys_str_mv AT knaboureh integratingthesequencedependentsetuptimeopenshopproblemandpreventivemaintenancepolicies
AT esafari integratingthesequencedependentsetuptimeopenshopproblemandpreventivemaintenancepolicies
_version_ 1725614428052783104