THE LIFE CYCLE COST MANAGEMENT (LCCM) ASPECTS OF MAINTENANCE IN URBAN PUBLIC TRANSPORT (UPT) SYSTEMS, ARGUMENTS FOR A GUIDE OF TRAMS MODERNIZATION
Planned life cycle is determined by how deep operating and maintaining the infrastructure and public transport vehicles, reducing costs is optimized by adapting appropriate strategies. Reliability and availability of transport systems mandatory minimum cost criteria must respect and maximum sa...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Oradea
2015-09-01
|
Series: | Journal of Sustainable Energy |
Subjects: | |
Online Access: | http://www.energy-cie.ro/archives/2015/nr_3/v6-n3-2.pdf |
id |
doaj-9ed7db7a0ba14351a33d91c7a65248d1 |
---|---|
record_format |
Article |
spelling |
doaj-9ed7db7a0ba14351a33d91c7a65248d12020-11-24T21:55:51ZengUniversity of OradeaJournal of Sustainable Energy2067-55342015-09-0163102111THE LIFE CYCLE COST MANAGEMENT (LCCM) ASPECTS OF MAINTENANCE IN URBAN PUBLIC TRANSPORT (UPT) SYSTEMS, ARGUMENTS FOR A GUIDE OF TRAMS MODERNIZATIONCSUZI I.0Oradea Transport Local SAPlanned life cycle is determined by how deep operating and maintaining the infrastructure and public transport vehicles, reducing costs is optimized by adapting appropriate strategies. Reliability and availability of transport systems mandatory minimum cost criteria must respect and maximum safety criteria. The paper contains findings and recommendations at both general and specific to the study. http://www.energy-cie.ro/archives/2015/nr_3/v6-n3-2.pdfplanned life cyclereliabilitymaintenanceassessments of obsolescencecost optimizationpublic transport system management |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
CSUZI I. |
spellingShingle |
CSUZI I. THE LIFE CYCLE COST MANAGEMENT (LCCM) ASPECTS OF MAINTENANCE IN URBAN PUBLIC TRANSPORT (UPT) SYSTEMS, ARGUMENTS FOR A GUIDE OF TRAMS MODERNIZATION Journal of Sustainable Energy planned life cycle reliability maintenance assessments of obsolescence cost optimization public transport system management |
author_facet |
CSUZI I. |
author_sort |
CSUZI I. |
title |
THE LIFE CYCLE COST MANAGEMENT (LCCM) ASPECTS OF MAINTENANCE IN URBAN PUBLIC TRANSPORT (UPT) SYSTEMS, ARGUMENTS FOR A GUIDE OF TRAMS MODERNIZATION |
title_short |
THE LIFE CYCLE COST MANAGEMENT (LCCM) ASPECTS OF MAINTENANCE IN URBAN PUBLIC TRANSPORT (UPT) SYSTEMS, ARGUMENTS FOR A GUIDE OF TRAMS MODERNIZATION |
title_full |
THE LIFE CYCLE COST MANAGEMENT (LCCM) ASPECTS OF MAINTENANCE IN URBAN PUBLIC TRANSPORT (UPT) SYSTEMS, ARGUMENTS FOR A GUIDE OF TRAMS MODERNIZATION |
title_fullStr |
THE LIFE CYCLE COST MANAGEMENT (LCCM) ASPECTS OF MAINTENANCE IN URBAN PUBLIC TRANSPORT (UPT) SYSTEMS, ARGUMENTS FOR A GUIDE OF TRAMS MODERNIZATION |
title_full_unstemmed |
THE LIFE CYCLE COST MANAGEMENT (LCCM) ASPECTS OF MAINTENANCE IN URBAN PUBLIC TRANSPORT (UPT) SYSTEMS, ARGUMENTS FOR A GUIDE OF TRAMS MODERNIZATION |
title_sort |
life cycle cost management (lccm) aspects of maintenance in urban public transport (upt) systems, arguments for a guide of trams modernization |
publisher |
University of Oradea |
series |
Journal of Sustainable Energy |
issn |
2067-5534 |
publishDate |
2015-09-01 |
description |
Planned life cycle is determined by how
deep operating and maintaining the infrastructure
and public transport vehicles, reducing costs is
optimized by adapting appropriate strategies.
Reliability and availability of transport systems
mandatory minimum cost criteria must respect and
maximum safety criteria. The paper contains findings
and recommendations at both general and specific to
the study. |
topic |
planned life cycle reliability maintenance assessments of obsolescence cost optimization public transport system management |
url |
http://www.energy-cie.ro/archives/2015/nr_3/v6-n3-2.pdf |
work_keys_str_mv |
AT csuzii thelifecyclecostmanagementlccmaspectsofmaintenanceinurbanpublictransportuptsystemsargumentsforaguideoftramsmodernization AT csuzii lifecyclecostmanagementlccmaspectsofmaintenanceinurbanpublictransportuptsystemsargumentsforaguideoftramsmodernization |
_version_ |
1725860953528991744 |