Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor
In the past few years, forest management unit (KPH) Bogor has experienced many problems, technical, environmental and social, affecting the company's finances. This condition requires new breakthroughs in the form of managerial options in managing the forests of KPH Bogor. At present, KPH Bog...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Bogor Agricultural University
2016-12-01
|
Series: | Jurnal Manajemen Hutan Tropika |
Subjects: | |
Online Access: | http://journal.ipb.ac.id/index.php/jmht/article/view/15465/11503 |
id |
doaj-9eb878ff044d4401a89d19acdcd5d98f |
---|---|
record_format |
Article |
spelling |
doaj-9eb878ff044d4401a89d19acdcd5d98f2020-11-25T02:29:48ZengBogor Agricultural UniversityJurnal Manajemen Hutan Tropika2087-04692089-20632016-12-0122316917910.7226/jtfm.22.3.169Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH BogorRicca Rohani Hutauruk0Nining Puspaningsih1Muhammad Buce Saleh2Graduate School of Bogor Agricultural University, Dramaga Main Road, Campus IPB Dramaga, Bogor, Indonesia 16680Environment and Forestry Education and Training Bogor Agency, The Ministry of Environment and Forestry, Jl. Prada Samlawi Rumpin, Bogor, IndonesiaDepartment of Forest Management, Faculty of Forestry, Bogor Agricultural University, Academic Ring Road, Campus IPB Dramaga, PO Box 168, Bogor, Indonesia 16680In the past few years, forest management unit (KPH) Bogor has experienced many problems, technical, environmental and social, affecting the company's finances. This condition requires new breakthroughs in the form of managerial options in managing the forests of KPH Bogor. At present, KPH Bogor has formulated 12 managerial options. The purpose of this study is to build a spatial model in selecting managerial options at site level. The spatial models were built based on the score of each land unit which was obtained from expert judgment using an intensity scale, while weight was obtained using a pairwise comparison, resulting in the following equation: total score = 0.14 (0.06x1+ 0.11x2 + 0.09x3 + 0.08x4 + 0.10yx5 + 0.31x6 + 0.25x7) + 0.72 (0.08y1 + 0.22y2 + 0.46y3 + 0.13y4 + 0.12y5) +0.14 0.45z + 0.05z + 0.44z + 0.06z . ( 1 2 3 4) The resulting total score was then divided into 5 classes using the equal interval method. The results for each of the managerial options were then aggregated using GIS to create KPH Bogor's management pattern. In areas where there was an overlap due to the similarity in options, a decision support system using neighboring similarity spatial analysis was used. This step allowed the spatial model to be built with many biophysical, social, and economic variables. This spatial model could map 12 types of managerial options at site level in the production structuring in KPH Bogorhttp://journal.ipb.ac.id/index.php/jmht/article/view/15465/11503forest management unitmulti-criteria analysisgeographic information systemPerhutani |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Ricca Rohani Hutauruk Nining Puspaningsih Muhammad Buce Saleh |
spellingShingle |
Ricca Rohani Hutauruk Nining Puspaningsih Muhammad Buce Saleh Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor Jurnal Manajemen Hutan Tropika forest management unit multi-criteria analysis geographic information system Perhutani |
author_facet |
Ricca Rohani Hutauruk Nining Puspaningsih Muhammad Buce Saleh |
author_sort |
Ricca Rohani Hutauruk |
title |
Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor |
title_short |
Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor |
title_full |
Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor |
title_fullStr |
Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor |
title_full_unstemmed |
Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor |
title_sort |
spatial modeling for determining managerial options for structuring productivity in kph bogor |
publisher |
Bogor Agricultural University |
series |
Jurnal Manajemen Hutan Tropika |
issn |
2087-0469 2089-2063 |
publishDate |
2016-12-01 |
description |
In the past few years, forest management unit (KPH) Bogor has experienced many problems, technical,
environmental and social, affecting the company's finances. This condition requires new breakthroughs in the form of
managerial options in managing the forests of KPH Bogor. At present, KPH Bogor has formulated 12 managerial
options. The purpose of this study is to build a spatial model in selecting managerial options at site level. The spatial
models were built based on the score of each land unit which was obtained from expert judgment using an intensity
scale, while weight was obtained using a pairwise comparison, resulting in the following equation: total score = 0.14
(0.06x1+ 0.11x2 + 0.09x3 + 0.08x4 + 0.10yx5 + 0.31x6 + 0.25x7) + 0.72 (0.08y1 + 0.22y2 + 0.46y3 + 0.13y4 + 0.12y5)
+0.14 0.45z + 0.05z + 0.44z + 0.06z .
( 1 2 3 4) The resulting total score was then divided into 5 classes using the equal
interval method. The results for each of the managerial options were then aggregated using GIS to create KPH
Bogor's management pattern. In areas where there was an overlap due to the similarity in options, a decision support
system using neighboring similarity spatial analysis was used. This step allowed the spatial model to be built with
many biophysical, social, and economic variables. This spatial model could map 12 types of managerial options at
site level in the production structuring in KPH Bogor |
topic |
forest management unit multi-criteria analysis geographic information system Perhutani |
url |
http://journal.ipb.ac.id/index.php/jmht/article/view/15465/11503 |
work_keys_str_mv |
AT riccarohanihutauruk spatialmodelingfordeterminingmanagerialoptionsforstructuringproductivityinkphbogor AT niningpuspaningsih spatialmodelingfordeterminingmanagerialoptionsforstructuringproductivityinkphbogor AT muhammadbucesaleh spatialmodelingfordeterminingmanagerialoptionsforstructuringproductivityinkphbogor |
_version_ |
1724831517656481792 |