Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor

In the past few years, forest management unit (KPH) Bogor has experienced many problems, technical, environmental and social, affecting the company's finances. This condition requires new breakthroughs in the form of managerial options in managing the forests of KPH Bogor. At present, KPH Bog...

Full description

Bibliographic Details
Main Authors: Ricca Rohani Hutauruk, Nining Puspaningsih, Muhammad Buce Saleh
Format: Article
Language:English
Published: Bogor Agricultural University 2016-12-01
Series:Jurnal Manajemen Hutan Tropika
Subjects:
Online Access:http://journal.ipb.ac.id/index.php/jmht/article/view/15465/11503
id doaj-9eb878ff044d4401a89d19acdcd5d98f
record_format Article
spelling doaj-9eb878ff044d4401a89d19acdcd5d98f2020-11-25T02:29:48ZengBogor Agricultural UniversityJurnal Manajemen Hutan Tropika2087-04692089-20632016-12-0122316917910.7226/jtfm.22.3.169Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH BogorRicca Rohani Hutauruk0Nining Puspaningsih1Muhammad Buce Saleh2Graduate School of Bogor Agricultural University, Dramaga Main Road, Campus IPB Dramaga, Bogor, Indonesia 16680Environment and Forestry Education and Training Bogor Agency, The Ministry of Environment and Forestry, Jl. Prada Samlawi Rumpin, Bogor, IndonesiaDepartment of Forest Management, Faculty of Forestry, Bogor Agricultural University, Academic Ring Road, Campus IPB Dramaga, PO Box 168, Bogor, Indonesia 16680In the past few years, forest management unit (KPH) Bogor has experienced many problems, technical, environmental and social, affecting the company's finances. This condition requires new breakthroughs in the form of managerial options in managing the forests of KPH Bogor. At present, KPH Bogor has formulated 12 managerial options. The purpose of this study is to build a spatial model in selecting managerial options at site level. The spatial models were built based on the score of each land unit which was obtained from expert judgment using an intensity scale, while weight was obtained using a pairwise comparison, resulting in the following equation: total score = 0.14 (0.06x1+ 0.11x2 + 0.09x3 + 0.08x4 + 0.10yx5 + 0.31x6 + 0.25x7) + 0.72 (0.08y1 + 0.22y2 + 0.46y3 + 0.13y4 + 0.12y5) +0.14 0.45z + 0.05z + 0.44z + 0.06z . ( 1 2 3 4) The resulting total score was then divided into 5 classes using the equal interval method. The results for each of the managerial options were then aggregated using GIS to create KPH Bogor's management pattern. In areas where there was an overlap due to the similarity in options, a decision support system using neighboring similarity spatial analysis was used. This step allowed the spatial model to be built with many biophysical, social, and economic variables. This spatial model could map 12 types of managerial options at site level in the production structuring in KPH Bogorhttp://journal.ipb.ac.id/index.php/jmht/article/view/15465/11503forest management unitmulti-criteria analysisgeographic information systemPerhutani
collection DOAJ
language English
format Article
sources DOAJ
author Ricca Rohani Hutauruk
Nining Puspaningsih
Muhammad Buce Saleh
spellingShingle Ricca Rohani Hutauruk
Nining Puspaningsih
Muhammad Buce Saleh
Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor
Jurnal Manajemen Hutan Tropika
forest management unit
multi-criteria analysis
geographic information system
Perhutani
author_facet Ricca Rohani Hutauruk
Nining Puspaningsih
Muhammad Buce Saleh
author_sort Ricca Rohani Hutauruk
title Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor
title_short Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor
title_full Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor
title_fullStr Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor
title_full_unstemmed Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor
title_sort spatial modeling for determining managerial options for structuring productivity in kph bogor
publisher Bogor Agricultural University
series Jurnal Manajemen Hutan Tropika
issn 2087-0469
2089-2063
publishDate 2016-12-01
description In the past few years, forest management unit (KPH) Bogor has experienced many problems, technical, environmental and social, affecting the company's finances. This condition requires new breakthroughs in the form of managerial options in managing the forests of KPH Bogor. At present, KPH Bogor has formulated 12 managerial options. The purpose of this study is to build a spatial model in selecting managerial options at site level. The spatial models were built based on the score of each land unit which was obtained from expert judgment using an intensity scale, while weight was obtained using a pairwise comparison, resulting in the following equation: total score = 0.14 (0.06x1+ 0.11x2 + 0.09x3 + 0.08x4 + 0.10yx5 + 0.31x6 + 0.25x7) + 0.72 (0.08y1 + 0.22y2 + 0.46y3 + 0.13y4 + 0.12y5) +0.14 0.45z + 0.05z + 0.44z + 0.06z . ( 1 2 3 4) The resulting total score was then divided into 5 classes using the equal interval method. The results for each of the managerial options were then aggregated using GIS to create KPH Bogor's management pattern. In areas where there was an overlap due to the similarity in options, a decision support system using neighboring similarity spatial analysis was used. This step allowed the spatial model to be built with many biophysical, social, and economic variables. This spatial model could map 12 types of managerial options at site level in the production structuring in KPH Bogor
topic forest management unit
multi-criteria analysis
geographic information system
Perhutani
url http://journal.ipb.ac.id/index.php/jmht/article/view/15465/11503
work_keys_str_mv AT riccarohanihutauruk spatialmodelingfordeterminingmanagerialoptionsforstructuringproductivityinkphbogor
AT niningpuspaningsih spatialmodelingfordeterminingmanagerialoptionsforstructuringproductivityinkphbogor
AT muhammadbucesaleh spatialmodelingfordeterminingmanagerialoptionsforstructuringproductivityinkphbogor
_version_ 1724831517656481792