Spatial Modeling for Determining Managerial Options for Structuring Productivity in KPH Bogor
In the past few years, forest management unit (KPH) Bogor has experienced many problems, technical, environmental and social, affecting the company's finances. This condition requires new breakthroughs in the form of managerial options in managing the forests of KPH Bogor. At present, KPH Bog...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Bogor Agricultural University
2016-12-01
|
Series: | Jurnal Manajemen Hutan Tropika |
Subjects: | |
Online Access: | http://journal.ipb.ac.id/index.php/jmht/article/view/15465/11503 |
Summary: | In the past few years, forest management unit (KPH) Bogor has experienced many problems, technical,
environmental and social, affecting the company's finances. This condition requires new breakthroughs in the form of
managerial options in managing the forests of KPH Bogor. At present, KPH Bogor has formulated 12 managerial
options. The purpose of this study is to build a spatial model in selecting managerial options at site level. The spatial
models were built based on the score of each land unit which was obtained from expert judgment using an intensity
scale, while weight was obtained using a pairwise comparison, resulting in the following equation: total score = 0.14
(0.06x1+ 0.11x2 + 0.09x3 + 0.08x4 + 0.10yx5 + 0.31x6 + 0.25x7) + 0.72 (0.08y1 + 0.22y2 + 0.46y3 + 0.13y4 + 0.12y5)
+0.14 0.45z + 0.05z + 0.44z + 0.06z .
( 1 2 3 4) The resulting total score was then divided into 5 classes using the equal
interval method. The results for each of the managerial options were then aggregated using GIS to create KPH
Bogor's management pattern. In areas where there was an overlap due to the similarity in options, a decision support
system using neighboring similarity spatial analysis was used. This step allowed the spatial model to be built with
many biophysical, social, and economic variables. This spatial model could map 12 types of managerial options at
site level in the production structuring in KPH Bogor |
---|---|
ISSN: | 2087-0469 2089-2063 |