Techno-economic assessment of 10 MW centralised grid-tied solar photovoltaic system in Uganda

There is increasing interest in solar PV installations in Uganda, however, there is little or no information available on performance of solar PV systems in Uganda. Since solar PV performance is site specific, there is need to provide stakeholders with information that could help them in making info...

Full description

Bibliographic Details
Main Authors: Ivan T. Oloya, Tar JL. Gutu, Muyiwa S. Adaramola
Format: Article
Language:English
Published: Elsevier 2021-06-01
Series:Case Studies in Thermal Engineering
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2214157X21000915
Description
Summary:There is increasing interest in solar PV installations in Uganda, however, there is little or no information available on performance of solar PV systems in Uganda. Since solar PV performance is site specific, there is need to provide stakeholders with information that could help them in making informed decision. Therefore, this paper presents a performance analysis of a 10 MW solar-photovoltaic plant installed in Soroti City, in Eastern Uganda (latitude 1°N, longitude 33°E). Energy production data for this solar power plant over a 3-year period between January 2017 and December 2019 were collected and analysed using IEC standard 61724–1. It was found that the average annual energy generation by the plant is 16702 MWh and specific energy output of 1670.2 kWh/kW. Furthermore, the daily final yield, annual performance ratio, annual capacity factor and energy yield per unit area are found as 4.58 h/day, 75.84%, 19.07%, and 121.4 kWh/m2. respectively. Based on the assumption used in this study and approved feed-in tariff, the estimated discounted payback period (9.28 years), profitability index (1.51), and internal rate of return (10.55%) showed that it is economically viable. The estimated levelized cost of energy of US$ 0.1087/kWh, is within range of values reported for similar projects.